My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200 REV D <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> March 13,2020 <br /> E. Leak Detection Fill <br /> 1. Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the <br /> DRAWINGS. <br /> 2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not <br /> cause rutting or other deleterious effects. <br /> F. Low Volume Solution Collection Fill <br /> 1. Low Volume Solution Collection Fill shall be placed over the geomembrane in the <br /> locations shown on the DRAWINGS. <br /> 2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface <br /> that does not cause rutting or other deleterious effects. <br /> 3. CONTRACTOR shall place Low Volume Solution Collection Fill around the Low Volume <br /> Solution Collection Vertical Riser Pipes in maximum 12-inch loose lifts and compact <br /> using a hand operated vibratory plate compactor to the satisfaction of the MANAGER <br /> and CERTIFYING ENGINEER. Low Volume Solution Collection Fill shall be worked <br /> under the Low Volume Solution Collection Rise pipe haunches by hand to provide <br /> uniform support of the pipe. <br /> 4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify by <br /> visual inspection that the underlying geosynthetics are free of holes, tears, wrinkles, <br /> or foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the <br /> geosynthetic for wrinkles prior to placement of Low Volume Solution Collection Fill. <br /> As instructed by MANAGER, CONTRACTOR shall "work out" wrinkles to the <br /> satisfaction of MANAGER and CERTIFYING ENGINEER prior to placement of the Low <br /> Volume Solution Collection Fill. In all cases, wrinkles shall not be of a size that they <br /> could fold back on themselves. Wrinkles greater than one foot shall be removed and <br /> repaired by the INSTALLER. <br /> 5. CONTRACTOR shall place Low Volume Solution Collection Fill in a single 36-inch loose <br /> lift. The tracked equipment shall operate only over previously placed Low Volume <br /> Solution Collection Fill. CONTRACTOR shall not operate equipment directly on <br /> geosynthetics. Only a dozer with a ground pressure not exceeding 14.7 psi can be <br /> used to place Low Volume Solution Collection Fill. Equipment used for placement will <br /> not be allowed to pivot on one track (i.e., no abrupt or sharp turns). There shall be <br /> no downhill placement on slopes steeper than 4H:1V. Material can be placed along <br /> contours if buttressed from below. <br /> 6. Rubber tired construction equipment shall not be allowed to travel over the <br /> geomembrane or on top of Solution Collection piping unless a thickness of at least <br /> 45 inches of Low Volume Solution Collection Fill has been placed over the <br /> geomembrane and on top of Solution Collection piping. The CONTRACTOR will be <br /> required to demonstrate to the MANAGER, DESIGN ENGINEER and CERTIFYING <br /> Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.