My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02200 REV D <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> March 13,2020 <br /> 5. Maximum rock size for rock fill shall be two-thirds of the compacted lift thickness, <br /> unless otherwise approved by MANAGER, DESIGN ENGINEER, and CERTIFYING <br /> ENGINEER. CONTRACTOR shall remove oversize materials from fills at no additional <br /> cost to CC&V. <br /> C. Select Structural Fill <br /> 1. Select Structural Fill shall be placed for miscellaneous site grading as required by the <br /> MANAGER and CERTIFYING ENGINEER. <br /> 2. CONTRACTOR shall condition Select Structural Fill to a moisture content that allows <br /> compaction to the required density and that results in a firm, unyielding surface <br /> capable of allowing the movement of vehicles and equipment over the surface <br /> without causing rutting or other deleterious effects. <br /> 3. CONTRACTOR shall place Select Structural Fill materials with less than 30 percent <br /> rock materials above 3/4-inch size in maximum 12-inch loose lifts, and compacted to <br /> 95 percent of maximum dry density (ASTM D698). <br /> 4. CONTRACTOR shall condition and place Select Structural Fill containing more than <br /> 30 percent rock materials above 3/4-inch size (rock fill) in maximum 12-inch loose <br /> lifts and compact by a method compaction technique. The compaction equipment <br /> shall consist of a minimum ten 10-ton (static drum weight) vibratory smooth-drum <br /> compactor. The number of passes shall be subject to CERTIFYING ENGINEER's <br /> approval, at no additional cost to CC&V. The method SPECIFICATIONS may be <br /> changed at anytime, at the discretion of CERTIFYING ENGINEER, based upon changes <br /> in material characteristics, field conditions, and/or compaction equipment. <br /> D. Underdrain Fill <br /> 1. Underdrain Fill shall be placed in the Underdrains as shown in the DRAWINGS. <br /> 2. CONTRACTOR shall condition Underdrain Fill that results in a firm, unyielding surface <br /> capable of allowing the movement of vehicles and equipment over the surface <br /> without causing rutting or other deleterious effects. <br /> 3. CONTRACTOR shall condition, place and compact Underdrain Fill by a method <br /> compaction technique. The compaction equipment shall consist of a minimum 10- <br /> ton (static drum weight) vibratory smooth-drum compactor. The number of passes <br /> and loose lift thickness shall be subject to CERTIFYING ENGINEER's approval, at no <br /> additional cost to CC&V. The method SPECIFICATIONS may be changed at any time, <br /> at the discretion of MANAGER, based upon changes in material characteristics, field <br /> conditions, and/or compaction equipment. <br /> 4. Provisions shall be made by CONTRACTOR for removal of oversize materials from <br /> fills, at no additional cost to CC&V. <br /> 5. The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.