My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-07-08_REVISION - M1980244 (21)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2020-07-08_REVISION - M1980244 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 2:35:35 AM
Creation date
7/9/2020 8:15:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/8/2020
Doc Name
VOL 2-Phase 2A, Part 3(1 OF 2)
From
CC&V
To
DRMS
Type & Sequence
TR122
Email Name
TC1
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.01400.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> August 25,2016 <br /> 7.1. Daily Record Keeping <br /> Daily records kept by the CQA Monitor shall consist of field notes, observation and testing data <br /> sheets, summary of the daily meeting with CONTRACTOR, and reporting of construction <br /> problems and resolutions. The CQA Monitor shall submit this information on a regular basis to <br /> MANAGER for review. <br /> 7.2. Soils Observation and Testing Forms <br /> The CQA Monitor will document soils observations on forms that generally include the <br /> following information: <br /> • date, project name, location, and weather data, including high and low daily temperatures; <br /> • a site plan showing work areas and test locations; <br /> ■ descriptions of ongoing construction detailing work areas and equipment utilized by <br /> CONTRACTOR; <br /> • summary of test results and samples obtained, with locations and elevations; <br /> • resolutions of deficient test results; <br /> ■ test equipment calibrations, if necessary; <br /> ■ summary of meetings held; and <br /> ■ signature or initials of the CQA Monitor. <br /> 7.3. Photo Documentation <br /> The CQA Monitor shall photograph all phases of construction. Photographs shall be identified <br /> by location, time, date, and name of the CQA Monitor taking the photograph. <br /> 7.4. Design and Specification Changes <br /> During construction, the need to address DESIGN and SPECIFICATION changes, modifications, or <br /> clarifications may arise. In such cases the CQA Monitor shall notify MANAGER, which shall <br /> notify the DESIGN ENGINEER and the CERTIFYING ENGINEER. DESIGN and SPECIFICATION <br /> changes shall only be made with written agreement from MANAGER and DESIGN ENGINEER. <br /> 7.5. Weekly Progress Reports <br /> The CQA Monitor shall prepare weekly progress reports summarizing all construction and <br /> quality assurance activities. This report shall be submitted to MANAGER and shall include the <br /> following information: <br /> • date, project name, and location; <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.