Laserfiche WebLink
2019 Plan of Operations Modification American Gypsum Company, LLC <br /> Drawing 03 shows the roads used to access the proposed mining activities included herein (1-70, <br /> Trail Gulch Road, and mine access roads). <br /> 5.5 Primary Mine Entrance Location <br /> The Mine entrance is located along Trail Gulch Road, branching off to the northeast while Trail <br /> Gulch Road continues north. American Gypsum is authorized to lock the gate at the intersection <br /> of Eagle County Road No. S-51 and BLM Route 8467/the haul route during non-business hours <br /> for safety purposes as described in the 1990 Plan of Operations CO-078-0-3P (BLM, 1990b). <br /> Drawing 03 shows the existing Mine entrance location. <br /> 5.6 Permanent Man-Made Structures <br /> There are no known permanent man-made structures within 200 feet of the proposed Upper Pit <br /> expansion, the East Pit, or associated roads as shown on Drawing 03. All Mine infrastructures, <br /> such as the Mine Office, laydown yards, generators, etc., are temporary. <br /> Am Gypsum Poo Mod ISSD 20190909 September 2019 1191 <br />