Laserfiche WebLink
Table 1 —Earthwork Zones <br /> Zone Location Description of work <br /> 1 SW of main slide area, across drainage draw Zone consists of stockpiled material from 2018 <br /> slide; Regrading of material to final stable slopes <br /> for revegetation. <br /> 3A Southern portion of originally identified 2018 slide Regrading to a stable permanent slope <br /> area,separated from 3B as no material moved in <br /> this area _ <br /> 3B __tPrincipal area of the 2018 slide Installation of subgrade drainage pipes and <br /> regrading to a stable permanent slope <br /> 4 Area immediately north of 2018 slide.Contains Installation of subgrade drainage pipes and <br /> older slide(pre-2010) regrading to a stable permanent slope <br /> Ralston TR 03 2 X 1:1,, <br />