Laserfiche WebLink
of Co <br /> *%� $ COLORADO DIVISI, ION, MINING AND SAFETY <br /> " x 1313 Sherman Street,] 4 80203 ph(303)866-3567 <br /> 187s RECEIVE <br /> ECS/mac <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET JUN 3 0 2020 <br /> File No.: M- 1 974-086 Site Name: Ralston Quarry <br /> '") . <br /> Jefferson <br /> County TR# (DRMS Use only <br /> Permittee:Asphalt Paving Co., Inc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Ben Langenfeld <br /> C) <br /> Please provide a brief description of the proposed revision: 3 <br /> Slide repair as-built. <br /> v 5' <br /> � a <br /> 0 <br /> W I1 <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. n11M <br /> The request for a TR is not considered"filed for review PP P"until the a ro riate fee is received b the ai o <br /> q Y = <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to 0 <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DM 0) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />