Laserfiche WebLink
RULE 2 PERMITS <br /> Total Percentage of each criteria for Truck Shovel Sequence: <br /> SAR=47.9 feet/326.8 feet= 15% <br /> Se =0.3 feet/326.8 feet=0% <br /> B =N/A <br /> Sat=N/A <br /> Mo=22.7 feet/326.8 feet= 7% <br /> Suitability analysis for Drill Hole 83-D3-12 shows all criteria within the suitable range. <br /> Drill Hole 83-D3-14 <br /> Unsuitability range in feet of Truck Shovel Sequence: <br /> SAR> 15 =N/A <br /> Se > 0.3 =N/A <br /> B >5.0=22.5 feet <br /> Sat<25 or>80=N/A <br /> Mo> 1.0=6.0 feet <br /> Total Depth from surface to Bottom of Truck Shovel Sequence (176) =212.0 feet <br /> Total Percentage of each criteria for Truck Shovel Sequence: <br /> SAR=N/A <br /> Se =N/A <br /> B =22.5 feet/212.0 feet= 11% <br /> Sat=N/A <br /> Mo=6.0 feet/212.0 feet=3% <br /> Suitability analysis for Drill Hole 83-D3-14 shows all criteria within the suitable range. <br /> After removal of the overburden, the coal seams are exposed. As the coal seams are exposed, they are <br /> cleaned using auxiliary equipment, then either drilled and shot with explosives or ripped to prepare the <br /> coal for loading and removal. <br /> When explosives are needed,the drilling is performed by an auger drill. The drill hole pattern is generally <br /> spaced approximately 12 feet by 12 feet,but is dependent upon the actual coal seam thickness. Drill holes <br /> are loaded with either ANFO or a waterproof explosive, if the holes are wet. <br /> Once the coal has been prepared for loading by blasting or ripping, a rubber-tired front-end loader loads <br /> the coal into haulage trucks. Following loading, these haulage trucks transport the coal along in pit <br /> haulage routes to the primary crusher located just outside of the mining area as shown on the Existing <br /> Structures - South Map (Map 22). <br /> In order to visualize the overall mine plan, a range diagram was drawn. This diagram is found as Mining <br /> Range Diagram (Map 24B) and depicts operations by draglines in combination with shovels and trucks. <br /> Coal from the mining area is transported to a coal crushing facility as shown on the Existing Structures - <br /> South Map (Map 22). Details of the coal crushing and load-out facilities are included in Volume 1, <br /> Section 2.05.3 under the heading of Mine Facilities. <br /> After coal recovery by conventional truck/shovel and dragline methods has reached the maximum <br /> economical recovery limit, Colowyo has the potential of using a highwall miner when the conditions <br /> allow. The highwall miner can recover additional reserves left in the pit face that were deemed non- <br /> South Taylor/Lower Wilson—Rule 2,Page 69 Revision Date: 6/22/20 <br /> Revision No.: MR-220 <br />