Laserfiche WebLink
(10) King I & II Coal Mine Area, Hydrologic Study, Resource Hydrologic <br /> Services, 01 31 2016 <br /> (11) Water Balance Study for the King II Mine, CDS Environmental <br /> Services LLC 05 08 2014 <br /> (12) GCC King I & II Water Quality Site & Analytical <br /> Recommendations, Resource H dro eolo is Services, February 5, 2016 <br /> (13) GCCE King I Upgradient Hay Gulch Alluvial Monitoring Well <br /> Specifications, Resource H dro eolo 'c Services, April 28, 2016 <br /> (14) U.S. Army Corp of Engineers Finding of No Significant Impact <br /> February 5, 2016 <br /> Climatological Data Summaries 5 <br /> Soil Resource Data and Analysis 6 <br /> 1 Field Data Sheet <br /> (2) Colorado State University Soil, Water and Plant Testing Laboratory <br /> Analysis <br /> 3 Soil Horizon Suitability Criteria for Reclamation <br /> Baseline Vegetation Report 7 <br /> (1) Baseline Vegetation Report, National King Coal, LLC, King II Mine, <br /> Hay Gulch, Colorado, August 2005 <br /> (2) 2005 Baseline Soil & Vegetation Surveys: Boundaries and Extent <br /> Addendum, Savage and Savage, Inc. 2019 12 11 <br /> Fish and Wildlife Information 8 <br /> 1 La Plata County Wildlife: Known or Likely Species Occurrence <br /> 2 Natural Diversity Information Source Sample Maps <br /> (3) Colorado Natural Heritage Program Database Survey, Colorado <br /> State University, July 15, 2017 <br /> 4 Colorado Div. of Wildlife Density Standard Approval <br /> 5 Natural Resource Survey, TR-22 Drill Sites, SWCA April 11, 2014 <br /> (6) Natural Resource Survey, TR-26 Drill Sites, Ecosphere <br /> Environmental Services, October, 2016 <br /> (7) Natural Resource Survey, MR-49 Drill Site, Ecosphere <br /> Environmental Services, Inc. July 9, 2019 <br /> USDA Important Farmlands of La Plata County, Colorado 9 <br /> Structure Designs 10 <br /> 1 Haul Roads; Description and Certifications <br /> 2 Access Roads; Certification <br /> Hydrologic Designs 11 <br /> 1 King II Mine Site Hydrology Analysis - Introduction Document <br /> lA SEDCAD Hydrology Model Tables TR-29 <br /> (113) SEDCAD Drainage Basin A to Pond 1 Flows Modified for King III <br /> Portals TR-29 . Fle al 04 29 2020 <br /> (1C) SEDCAD Ditch CWD-lA SEDCAD As-Built (Stations 0+00 to <br /> 18+95 Culvert C-3 to CWD-2 . Chlo ek 12 03 2015 <br /> (1D) SEDCAD Ditch CWD-1A SEDCAD As-Built (Stations 18+95 to <br /> 24+01) Upstream flows from CWD-113 to CWD-2 via Culvert C-2. <br /> Chlo ek 06 29 2015 <br /> (1 E) SEDCAD CWD-1 C and CWD-1 D As-Built to CWD-2 via cattle <br /> guard. Chlo ek 06 29 2015 <br /> (1F) Revised East Clearwater Diversion (CWD-2): Modified for 2020 <br /> Portal. Fle al05 01 2020 TR-29 <br /> 1G SEDCAD Pond 1 Flows to Outlet. Chlo ek 06 29 2015 <br /> 5 Safety Factor Analysis for Sediment Pond, Environmental Industrial <br /> GCC Energy, LLC King II Mine <br /> Table of Contents <br /> Page iii June 12, 2020 (PR-10) <br />