Laserfiche WebLink
TABLE OF CONTENTS <br /> APPENDICES <br /> TOPIC TAB <br /> Right of Entry Information 1 <br /> 1 State of Colorado Coal Lease CO-3388 <br /> 2 B.L.M. Modified Coal Lease COC-62920, Issued 01 31 2018 <br /> 3 Landowner Surface Use Agreements, TR-26 Monitoring Wells <br /> 4 B.L.M. Coal Lease COC-78825, Issued 06 10 2020 <br /> Licenses and Permits 2 <br /> 1 Zoning Compliance La Plata Count <br /> 2 Air Emission Permit Co. Dept. of Health <br /> 3 Wastewater Discharge Permit Co. Dept. of Health <br /> 4 Landowner Letters <br /> 5 Monitoring Well Permits <br /> 6 Water Augmentation Plan <br /> (7) U.S. Army Corps of Engineers: Section 404-No Permit <br /> Required Determination <br /> Cultural and Historic Resource Survey 3 <br /> 1 SHPO Concurrence letter <br /> (2) Cultural Resource Inventory, Hay Gulch Area, Complete <br /> Archaeological Service Associates. August 2005 <br /> 2A CASA survey area map overlay 12 18 2019 MR-50 <br /> 213 CASA survey SHPO Concurrence letters 03 2020 TR-29 <br /> (3) Cultural Resource Survey, TR-22 Drill Sites, SWCA February 19, <br /> 2014 <br /> (4) Cultural Resource Survey, TR-26 Drill Sites, Stratified <br /> Environmental and Archaeological Services (SEAS), October, 2016 <br /> 5 Cultural Resource Survey, MR-49 Drill Site, SEAS Jul 11, 2019 <br /> 6 SHPO Concurrence Letters, King III Portals & Access Roads TR-29 <br /> Geological and Hydrologic Data 4 <br /> 1 Excerpts from NEDO Project Geological Re ort, Corte, Jan. 1999 <br /> (2) Hydrologic Water Data: Groundwater Wells and <br /> Irrigation Ditch <br /> 3 Roof& Floor Chemical Analysis <br /> (4) TR-22 Drill Sites: Location &Topography, Drill Hole Abandonment <br /> Drawing, Typical Drill Site Drawing <br /> (5) Colorado Division of Water Resources, DWR Well Data Sheets, <br /> 05 23 2020 <br /> (6) GCC Energy King II Coal Mine Hydro Study, Norwest Corporation, <br /> February 11, 2014 <br /> (7) Cumulative Hydrologic Impact Assessment for Hay Gulch, La Plata <br /> County, Colorado, Tom Kaldenbach, Colorado Division of Minerals and <br /> Geology, Revised October, 2006 <br /> (8) King I Mine - Refuse Pile Sampling Plan, MR-41, September 14, <br /> 2016 <br /> (8A) Additional Sampling Plan of King II Roof, Coal & Floor, PR-10, <br /> June 12, 2020 <br /> (9) Bedrock Cluster Monitor Well Specifications, Resource Hydrologic <br /> Services, 10 15 2015 TR-26 <br /> GCC Energy, LLC King II Mine <br /> Table of Contents <br /> Page ii June 24, 2020 (PR-10) <br />