Laserfiche WebLink
of COOTR07 <br /> $ COLORAI JG AND SAFETY <br /> r876 1313 ECS/mac i-3567 RECEIVED <br /> REOUEST FOR TECHNICAL REVISION (TR) COVER SHEET JUN 19 2020 <br /> 1973-021 Morrison Quarry DIVISION RECLAMATION <br /> � 1 <br /> File No.: M- Site Name: <br /> County Jefferson TR# (DBMS Use only) <br /> Permittee:Aggregate Industries - WCR Inc. <br /> Ao 3 <br /> Operator(If Other than Permittee): <br /> � - w <br /> Permittee Representative: <br /> GEI Consultants Inc. b <br /> Please provide a brief description of the proposed rcvision: <br /> Proposed revision is for new haul road leading to upper portions of the West and South <br /> Quarries. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted N <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, m o --1 <br /> the Division may require the submittal of a permit amendment to make the required or desired changes 0to <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) S 175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 7 <br />