Laserfiche WebLink
Table 1 —Specific Midterm Review Topics <br /> Section Topic Applicability at Trapper Mine <br /> 2.06.2(10) Experimental practices Inapplicable, no such practices. <br /> 2.06.3(4)(a) Mountaintop removal Inapplicable, no such variances. <br /> variances <br /> Inapplicable, no such variances <br /> exist at the time of this review. <br /> However, TMI has requested a <br /> Variances from approximate variance in the approximate <br /> 2.06.5(3)(c) original contour for steep original contour requirement for a <br /> slope mining portion of the site with the Permit <br /> Revision No. 9 (PR9) application. <br /> This application and the associated <br /> request for a variance is currently <br /> under review by DRMS. <br /> Reclamation delay at <br /> 2.06.7(5) combined surface/subsurface Inapplicable, surface mine only. <br /> mines <br /> 3.02.2(4) Adequacy of bond amount Applicable. <br /> and terms <br /> Regarding steep slopes (Rules 2.06.4, 2.06.5, and 4.27), no specific approvals have been <br /> granted to TMI for the Trapper Mine (RN-07). However, as discussed in Table 1, DRMS is <br /> reviewing TMI's request for a variance for this with PR9. <br /> Midterm Review Methodology <br /> For this Midterm Review, the Division reviewed the following documents: <br /> l. Permit application; <br /> 2. Revisions made to the permit since the last permit renewal; <br /> 3. Annual reclamation and hydrology reports; <br /> 4. Bond surety and reclamation cost estimate; <br /> 5. Division findings documents and previous Midterm Reviews; <br /> 6. Notices of violations since last permit renewal, if any. <br /> MT8_Trapper Midterm 2020 Findings JLE.docx Page 2 <br />