My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-16_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-06-16_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 8:50:22 PM
Creation date
6/16/2020 3:49:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/16/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I- INTRODUCTION <br /> Purpose of this Document <br /> This document presents the results of the Midterm Permit Review number 8 (MT8) of the <br /> Trapper Mining, Inc. (TMI) Trapper Mine. The Colorado Division of Reclamation, Mining <br /> and Safety(Division) conducted this review for the purpose of fulfilling the requirements of <br /> the Colorado Surface Coal Mining Reclamation Act(Act), and the Regulations of the Colorado <br /> Mined Land Reclamation Board for Coal Mining (Regulations). <br /> Organization of this Document <br /> This document is divided into the following three parts: <br /> Part I - Introduction <br /> Part II— Summary of Operations, Revisions to Permit, <br /> Violations, Stipulations, Variances, and Bond <br /> Part III—Requested Revisions of Permit Application <br /> Midterm Review Requirements of the Regulations <br /> Section 2.08.3 of the Regulations requires the Division to conduct a general review of each <br /> mining and reclamation permit prior to the middle of the permit's term (2 % years). Based on <br /> this Midterm Review, for good cause shown, the Division may require the permittee to revise <br /> or modify the permit in order to ensure compliance with the Act and Regulations. <br /> Table I lists the other Sections of the Regulations that require a Midterm Review of specific <br /> aspects of each permit. <br /> MT8_Trapper Midterm 2020 Findings JLE.docx Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.