My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-16_PERMIT FILE - M2020007 (7)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020007
>
2020-06-16_PERMIT FILE - M2020007 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 7:47:25 AM
Creation date
6/16/2020 11:36:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020007
IBM Index Class Name
Permit File
Doc Date
6/16/2020
Doc Name
Adequacy Review Response #2
From
Environment, Inc.
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L RECLAMATION COST ESTIMATE(cont) <br /> will be required, so 647, 680 yards of fill material is needed for <br /> backfilling. No seeding is needed, as area will become cropland. <br /> Phase 3 is disturbed as it will be used as a processing <br /> plant and stockpiling area, potential drying pad for settling <br /> pond fines, overburden storage, topsoil storage and equipment <br /> parking areas . Approximately 60 . 6 acres will be disturbed on <br /> this stage, and they would need to be resoiled (91, 500 yards) and <br /> graded. This area will be reclaimed as cropland, so no seeding <br /> would be done until the farmer puts it back into production. <br /> Estimated concrete foundations to remove for processing plant is <br /> 200 yds of concrete . The slurry wall is not installed since <br /> mining has not started in this Phase so cost is not included. <br /> The calculations in this estimate are for bonding the slurry <br /> wall liner uses the estimated length of the slurry wall , in the <br /> effected Phases (Phase 1) , times the average depth, which <br /> includes the bedrock key. The estimated unit cost is based on <br /> DRMS past bond calculation of $5 . 00/sq-ft with no reduction for <br /> certificate construction. <br /> Dewatering costs are based on dewatering all of Phase 1 or <br /> 64 . 31 acres, average depth 29 ft . For the slopes volumes, there <br /> would be 11 . 47 acres of 3 : 1 (166 ac-ft) , 2 . 40 acres of near <br /> vertical (35 . 0 ac-ft) slopes , and the floor area of 52 . 84 acres <br /> (1 , 532 ac-ft) . Total water volume to de-water in the Phase 1 lake <br /> area is 1733 . 48 ac-ft (number is total depths plus half of slope <br /> areas times 29 ft . ) . The aquifer inflow (transmissivity) would be <br /> 72 , 300 gal/day/sq-ft according to our records . Total dewatering <br /> time includes 21 . 8 days to pump the lake, 5 . 66 days to build <br /> slopes and 0 . 23 days to pump recharge . The total pumping time is <br /> rounded to 28 . 0 days . The settling ponds areas can be push-filled <br /> to a level 2 foot over the ground water table, so no dewatering <br /> cost is included for Phase 1A. <br /> The Equipment Used in the Estimate Is: <br /> Scraper teams - 2-Cat 627G scraper, D9R Dozer, 140H grader & <br /> water truck - Resoiling & backfilling <br /> Grader - Cat 140H - seedbed prep and ripping plant site <br /> Loader - Cat 688 - armoring placement <br /> Dozers - 2 - Cat D9R - cut/fill working face sloping <br /> Dewatering Pump data 3-600M (6000 gpm each) , 1511 , 121'suction & <br /> discharge hoses - total (18 , 000 gpm) <br /> Seeding team - standard farm tractor and pull behind drill , and <br /> crimping disk attachment <br /> L.G.Everist,Inc. Ragsdale Reservoirs June 11,2020 <br />