EXHIBIT L <br /> RECLAMATION COSTS (revised 6111/20) <br /> The following information is provided to evaluate the amount <br /> of bond needed when mining has reached a point where L.G. <br /> Everist, Inc . has approximately 180 acres disturbed in some form <br /> or another. Not all of the 180 acres will be disturbed as some <br /> areas may be reservoirs that await certification and final <br /> release and need no other work to reclaim them. The numbers <br /> presented for each item are based on what is estimated to be <br /> disturbed at the time when mining has impacted much of the areas <br /> in Phase 1 , 1A, and 3 . At this mine, it will not be necessary to <br /> import fill material to complete reclamation in Phase 1A, as <br /> discussed in the Mining Plan. The RECLAMATION ACTIVITIES table <br /> below shows the various items needed to reclaim the initial 3 <br /> phases once full production is taking place in that area . In <br /> this scenario : <br /> Phase 1 is the active mining area . There are 30 acres <br /> stripped in front of the working face that is 2600 ft long (5 . 65 <br /> yds/lft) cut/fill <br /> sloping) . Dewatering was calculated on the maximum pumping time <br /> being just as mining ends on this phase leaving only the highwall <br /> to be graded. That would require dewatering 64 . 31 acres to <br /> finish cut-filling on the highwall and final side sloping <br /> adjacent to the working face since it has not been certified. <br /> All other slopes will be finished as mining progresses to limit <br /> the amount of final sloping needed. Resoiling and seeding would <br /> be required on 38 . 03 acres, 30 acres stripped and 8 . 03 bank slope <br /> reclamation. The completed slurry wall is 7900 feet long at 43 <br /> ft . deep . No more than a 1000 foot section of bank armoring on <br /> the south end will require placement at any time requiring 2 . 35 <br /> cy/lf of material (2350 cyds) . A stockpile of this material will <br /> be maintained adjacent to the area it is needed so the only cost <br /> is for placement . No QA/QC number is included since the walls <br /> have been placed prior to mining beginning in any Phase . <br /> Phase lA being used as a settling/fresh water pond. Bonding <br /> is just if backfilling is needed. Material to complete back- <br /> filling in this phase will be stockpiled on the south end of <br /> Phase lA and North end of Phase 3 to reduce the haul distance . <br /> There are 15 . 88 acres of backfilling to fill to a level that is 2 <br /> feet above the existing ground water elevation. No side sloping <br /> L.G.Everist,Inc. Ragsdale Reservoirs June 11,2020 <br />