EXHIBIT D MINING PLAN (CONT) <br /> SOIL UNIT NAME APPROX DEPT OF DEPTH OF <br /> UNIT AREA TOPSOIL, OVERBURDEN <br /> (AC) (INCHES) (INCHES) <br /> 1 Altvan loam, 0 to 1 percent slopes 265.7 10 25 <br /> 2 Altvan loam, 1 to 3 percent slopes 93.3 10 24 <br /> 3 Aquolls and Aquents, gravelly 198.7 12 36 <br /> substratum <br /> 10 Ellicott-Ellicott sandy-skeletal complex, 23.8 0 0 <br /> 0 to 3 percent slopes, rarely flooded <br /> 16 Colby loam, 3 to 5 percent slopes 10.7 7 36 <br /> 21 Dacono clay loam, 0 to 1 percent 23.7 12 36 <br /> slopes <br /> 22 Dacono clay loam, 1 to 3 percent 20.4 12 36 <br /> slopes <br /> 38 Nelson fine sandy loam, 3 to 9 percent 0.0 9 NA <br /> slopes <br /> 42 Nunn clay loam, 1 to 3 percent slopes 0.2 9 NA <br /> 53 Otero sandy loam, 3 to 5 percent 45.0 12 36 <br /> slopes <br /> 76 Vona sandy loam, 1 to 3 percent 0.1 6 NA <br /> slopes <br /> Based on the soils report and on site observations there are <br /> sufficient quantities of soil available to reclaim the disturbed <br /> lands to their present condition. The excess overburden will be <br /> placed into the five (5) settling ponds/overburden backfill Phases <br /> shown on the MAP EXHIBIT C-1 - MINING PLAN MAP, or removed from the site . <br /> The soils on the permit area that will be salvaged and <br /> replaced should be capable of growing vegetation consistent with <br /> what is required by the Reclamation Plan. The average depth of <br /> topsoil on the site according to the NRCS report and site <br /> investigations is 0 to 12 inches deep. Enough topsoil will be <br /> retained to place an average of 6-12 inches on the areas to be <br /> revegetated. As each area is stripped, L.G. Everist will determine <br /> how much soil will be needed to reclaim the area and it will be <br /> stockpiled for use in reclamation. Over the life of the mine, an <br /> estimated 816 , 000 yards of topsoil will be stripped from the mined <br /> area but, a minimum of 241, 500 yards will be retained for resoiling <br /> the areas to be revegetated. In addition, there is from 0 to 3 <br /> feet of overburden on most of the site . Much of this overburden <br /> will be retained and used to backfill the areas shown on the maps <br /> or removed from the site. <br /> The topsoil and overburden stockpiles will be located around <br /> the excavation, typical piles in possible location are shown on the <br /> MAP EXHIBIT C-1 - MINING PLAN MAP. If the soil stockpiles remain <br /> undisturbed for more than one year, a cover crop of the approved <br /> seed mix, at the rate called for in the Reclamation Plan, will be used <br /> to revegetate them. <br /> L.G. Everist, Inc- Ragsdale Reservoirs June 11, 2020 <br /> D-4 <br />