COLORADO
<br /> Division of Water Resources
<br /> Department of Natural Resources
<br /> May 28, 2020
<br /> Mr. Dan Mathes
<br /> Deere Et Ault Consultants Inc.
<br /> 600 S. Airport Road, Building A, Suite 205
<br /> Longmont, CO 80503
<br /> Sent via email to:
<br /> Re: Pueblo East Pit at Evans #2
<br /> 2020 - 2021 Substitute Water Supply Plan Renewal
<br /> DRMS File No. M-2000-041
<br /> Sec. 35, Twp. 20S, Rng. 63W, 6th P.M.
<br /> Sec. 2, Twp. 21 S, Rng. 63W, 6th P.M.
<br /> Water Division 2, Water District 14
<br /> SWSP ID 5732, WDID 1407820
<br /> Approval Period: April 1, 2020 through March 31, 2021
<br /> Contact Phone: (303) 651-1468
<br /> Contact Email: dan.mathes@deereault.com
<br /> Dear Mr. Mathes:
<br /> We have reviewed your March 6, 2020 letter requesting a renewal of the substitute water supply plan
<br /> ("SWSP") previously approved for April 1, 2019 through March 31, 2020, in accordance with Section
<br /> 37-90-137(11)1 C.R.S., for a sand and gravel pit (well permit no. 54064-F, WDID 1406561), partially
<br /> owned by Fremont Paving Et RediMix, Inc. ("Fremont Paving" or "Applicant"). The required renewal
<br /> fee of $257.00 for the 2020 - 2021 plan year has been received and given receipt no. 10000149. The
<br /> applicants shall be responsible for compliance with this SWSP, but the State Engineer's Office may
<br /> also pursue the landowner for eventual compliance.
<br /> The Evans #2 Pit has been divided into separately owned areas both operating under DRMS Permit No.
<br /> M-2000-041. Fremont Paving's portion of the Evans #2 Pit (the subject of this SWSP), now referred to
<br /> as the Pueblo East Pit ("Pueblo East Pit at Evans #2") consists of Phase I-Parcels 1-3 and Phase
<br /> II-Parcel 5 of the mine site as shown on the attached Figure 1. Lagged depletions from previous
<br /> operations at the site and from current operations at Phase I-Parcels 1-3 and Phase II-Parcel 5 are
<br /> covered under this SWSP, while current operations at Phase I-Parcel 4 are covered under a separate
<br /> SWSP for the Evans #2 Pit (SWSP ID 2709), submitted by Stonewall Springs Quarry, LLC/Morley
<br /> Companies. A Plan for Augmentation was decreed in Division 2 Water Court Case no. 16CW3021 on
<br /> December 17, 2018 for EWSD I, LLC, and allows for dewatering from this pit to irrigate lands under
<br /> the Excelsior Ditch.
<br /> �, a ,,:� „,
<br /> Wf
<br /> II� ", � COgym*„�. NAM ,�:"" � �ro
<br /> u m u+::::::::�: m'Wi ,VI�:::::::fi!.. r ( o � n ( r. „ '4 �;, d'
<br /> �, W. III p pp 7�^II�,.. III,:� ,, fir u 4� IX I�,� �. V V ,...� i 1„ o �� W ,�ma i� .o�: N�, p�' �N u � ,""
<br /> i, �«tir �,,� �,�@ III�I�iIX�t� ��UIw�U��" � UlY Irv.a����_ a �« V�i�ui„�,�1,��e��1 p `���;W���Vi`wiY4���,��w��w�' � �u rd��"'ILn,����,,.„ "��M��iN�r; 4 g�U� �m,�W��,N��:,�`1N.4"��":��r�wsi,a a�i�I�f M r!u�M i� ( w
<br /> r
<br /> ry
<br /> r
<br /> „s I�. �:r, w.•� +I � „,-:N o, !ar
<br /> �„„ 1/1"', w i-
<br /> W G b 0 k as N N m fl
<br /> r! � �;�� I ����iu�� � ��
<br /> �! .� ��� � �or �� �
<br /> roo
<br />
|