Laserfiche WebLink
6.4. 12 Exhibit L <br /> Reclamation Costs <br /> RECLAMATION COST SUMMARY Date: 5/5/2020 <br /> Site: Ordway Pit Permit No.: M-2006-054 <br /> Description: Reclaim site <br /> DIRECT COSTS <br /> TASK LIST <br /> Task# Description Task Hours Cost <br /> 001 Spread topsoil across 26.6 acres, 6 inches deep 14.49 $ 13,385.00 <br /> 002 Revegetating 40 acres to range land 160.00 $ 50,276.00 <br /> 002E Reseed 40 acres 30.00 $ 14,022.00 <br /> 003 Grade 40 acres 24.08 $ 5,290.00 <br /> 004 Mobilization and demobilization 4.81 1 $ 6,002.00 <br /> SUBTOTAL $ 88,975.00 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability insurance: 2.02% $ 1,797.30 <br /> Performance bond: 1.05% $ 934.24 <br /> Job superintendent 10 hours $ 750.00 <br /> Profit: 10% $ 8,897.50 <br /> CONTRACT <br /> AMOUNT <br /> (DIRECT <br /> AND O&P) $ 101,354.03 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT <br /> Engineering work and/or contract/bid preparation 0.00% $ - <br /> Reclamation management and/or administration 5.00% $ 5,067.70 <br /> TOTAL BOND AMOUNT $ 106,421.73 <br /> Page 9 of 12 <br />