My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-27_REVISION - M1987164
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987164
>
2020-05-27_REVISION - M1987164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 6:54:09 AM
Creation date
5/28/2020 1:34:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987164
IBM Index Class Name
REVISION
Doc Date
5/27/2020
Doc Name
Request For Amendment To Permit
From
Oldcastle SW Group, Inc.
To
DRMS
Type & Sequence
AM3
Email Name
TNL
JDM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E RECLAMATION PLAN <br /> 1. General Reclamation Plan <br /> The total area of the permit is 103.2 acres. The permit has both a disturbed area and an <br /> undisturbed area. Much of the undisturbed areas are perimeter areas of the pit. The reclaimed <br /> land use is shown in Table E-1. <br /> Table E-1 - Uncompahgre Pit Reclamation Land Use <br /> Land Use Area(Acres) <br /> Revegetated(Hay meadow and dryland pasture) 76.0 <br /> Camilletti Pit completed reclamation as a subset of <br /> hay meadow. _ 44'7 <br /> Access Roads(left in place) _ 2.4 <br /> Undisturbed Areas 24.8 <br /> Total Permit Area 103.2 <br /> Reclamation will be conducted as new areas are disturbed throughout the year. This will most <br /> likely happen in small increments a few times per year, with topsoil, crusher fines, and <br /> overburden being placed in the previously excavated areas of the pit. This concurrent <br /> reclamation helps minimized disturbed area and keep the bond low. See Map F-1 for details. <br /> The Camilletti Pit area has been reclaimed to hay meadow, as required. The rest of the site will <br /> be reclaimed in a similar manner to hay meadow and dryland pasture. The access roads will <br /> remain reach the properties. The backfilling will be accomplished with overburden and fines <br /> from on site and imported fill possibly. Any material imported from off-site will be certified <br /> inert. <br /> The pit will strip topsoil and place this topsoil directly on regraded mined out areas in back of the <br /> pit. In this way, reclamation will be concurrent and the maximum pit exposed area at any one <br /> time will be limited. This will also help reduce the exposed land area, which will reduce the <br /> reclamation bond and impacts to wildlife. <br /> 2. Topsoil Replacement. <br /> This exhibit is unchanged from the currently approved permit. Information for this exhibit can be <br /> found in the following locations of the existing permit file: <br /> Hayden Gravel Pit E-I GIN 1xwkki 8„4 As cistm PLIA' <br /> May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.