Laserfiche WebLink
Castle Concrete Aggregates-Grisenti Gravel Pits <br /> Example SWSP Accounting Form <br /> May 2020 <br /> Evaporation❑ExposedGroundWater Area Historical Unlagged Ditch Lagged Exch.❑ Requirements <br /> Replacement Requements Replacement <br /> Production Dust Control Reclamation Irrigation Net Exposed Ground Water Area(acres) Net Evaporation Vol(ac-ft) First-Fill cf'Phase 2 Total Total Irrigation Deliveries Historical Water from Remaining Twin Lakes Balance <br /> Mined Water Meter Water Phase 1 Phase 2 Evap. Ground Water Unlagged Mining Lagged Mining Credit to Phase 1 Irrigation Credit Pueblo Replacement Release Credit(+)1 <br /> Material Consumed Reading Use Meter Amount Meter Amount Rate Phase 1 Phase 2 Total Phase 1 Phase 2 Total Infiltration Depletion Depletion Debit(-) Pond To River Reservoir Requirement Debit(-) <br /> (tons) (ac-ft) (gallons) (ac-ft) (gallons) (ac-ft) (gallons) (ac-ft) (ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) <br /> Month [1] [2] [3a] [3b] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] <br /> Apr-20 0 0.00 3,696,938 0.29 0.00 0.00 0.00 0.00 0.26 24.00 22.10 46.10 6.25 5.75 12.00 19.81 32.10 30.11 13.91 13.91 7.83 22.28 0 0 0.00 <br /> May-20 0 0.00 3,793,801 0.30 362057 1.11 1267198 3.89 0.36 24.00 22.70 46.70 8.66 8.19 16.85 24.89 47.04 42.46 40.06 40.06 27.88 14.58 0 0 0.00 <br /> jUn7_,s _._Wi :}<_ <br /> Auu- <br /> 'Dec <br /> _ . <br /> -.. <br /> - <br /> t i <br /> € 3 <br /> A r-20-Mar-21 0 0.00 - 0.58 3.89 - - - - 14.91 13.95 28.86 44.70 79.14 72.57 53.98 53.98 35.72 36.86 0.00 0.00 0.01 <br /> --] <br /> Notes: <br /> [2]Water use based upon end-of-month meter readings reported by Castle Concrete Aggregates.January 2019 end-of-month meter reading is 3,603,200 gallons. <br /> [3a],[3b]Reclamation irrigation use at Phases 1 and 2.Water will be pumped from either Phases 1 or 2 and will be lagged useing URF factors for each phase,as described in 2020 SWSP.Irrigation uses are assumed 100%consumptive. <br /> [4]Net Evaporation calculated as described in the 2020 SWSP renewal request <br /> [5]Individual and total exposed ground water area reported by BBA or Castle Concrete Aggregates.Projected surface area in Phase 2 based on expected volume❑ffill during month. <br /> [6]Individual and total evaporative depletion volume equal to net evaporation rate[4]multiplied by the exposed ground water-area[5]. <br /> [7]Unlagged ground water infiltration into Phase 2 pit resulting from cessation of dewatering and first-fill operations at the pit.Value conservatively assumes no direct delivery of water to Phase 2 via Lester-Attebery Ditch. <br /> [8]Total unlagged mining depletions equal[1]+[2]+[3a]+[3b]+[6]+[7]. <br /> [9]Total lagged mining depletions are lagged using URF factors for each mining area,developed in IDS-AWAS employing the glover method.IDS-AWAS inputs are specified in the 2020 SWSP renewal request. <br /> [10]Based on Historical Irrigation Credits/Debits fr❑mBBA analysis in 2010 SWSP request,continued in 2020 SWSP. <br /> [11]Actual replacement deliveries to the Phase 1 recharge pond measured through a 2-foot rectangular weir by a continuous recorder. <br /> [12]Historical irrigation credits delivered from Lester-Attebury Ditch to the Phase 1 pond are lagged using URFs for Phase 1,developed in IDS-AWAS employing the glover method.IDS-AWAS inputs are specified in the 2020 SWSP renewal request <br /> [13]Replacement water delivered to Arkansas River out of Pueblo Reservoir,Pueblo West Pit reservoir or Pueblo East Pit Phase 2 reservoir via administrative exchange.Source of water is one-time lease water from PBWW. <br /> [14]If[10]is negative,equals maximum of[9]-[10]-[12]-[13]and zero,else if[10]is positive,equal to maximum of[9]-[12]-[13]and zero. <br /> [15]Twin Lakes Release is assessed a 10.3%transit loss based upon a loss of 0.07%per mile and a distance of 147.8 miles.Manual input <br /> [16]Equal t❑[12]+[13]+[15]*(1-0.103)-[9]-minimum❑f[10]and zero. <br /> BBA Printed On:4/16/2020 PJB <br />