Laserfiche WebLink
Table 3 <br /> Castle Concrete Aggregates-Grisenti Pit <br /> 2-Year Projected Replacement operations <br /> (all values in acre-feet) <br /> Total Lagged HCU Credit& Projected Lagged HCU Remaining Reservoir <br /> Mining Return Flow Credits Delivered Replacement Excess Delivery <br /> Depletion obligation to the River Requirements Credits Requirements <br /> Month 1 2 3 5 <br /> Apr-20 30.11 13.91 7.83 22.28 0.00 22.28 <br /> May-20 42.46 40.06 27.88 14.58 0.00 14.58 <br /> Jun-20 53.15 42.12 39.81 13.34 0.00 13.34 <br /> Jul-20 56.26 47.67 45.14 11.12 0.00 11.12 <br /> Aug-20 47.67 33.03 39.13 8.55 0.00 8.55 <br /> Sep-20 36.59 24.58 29.06 7.53 0.00 7.53 <br /> Oct-20 28.36 20.22 22.58 5.77 0.00 5.77 <br /> Nov-20 19.18 -7.61 9.07 17.72 0.00 17.72 <br /> Dec-20 15.39 -4.43 1.09 18.73 0.00 18.73 <br /> Jan-21 13.09 -3.40 0.00 16.49 0.00 16.49 <br /> Feb-21 11.09 -2.57 0.00 13.66 0.00 13.66 <br /> Mar-21 14.37 -2.47 0.00 16.84 0.00 16.84 <br /> 20-21 Total 367.73 201.12 221.60 166.61 0.00 166.61 <br /> Apr-21 19.53 13.91 7.83 11.70 0.00 11.70 <br /> May-21 28.27 40.06 27.88 0.39 0.00 0.39 <br /> Jun-21 35.74 42.12 39.81 0.00 4.07 0.00 <br /> Jul-21 31.22 47.67 45.14 0.00 13.92 0.00 <br /> Aug-21 26.72 33.03 39.13 0.00 12.41 0.00 <br /> Sep-21 23.01 24.58 29.06 0.00 6.05 0.00 <br /> Oct-21 18.06 20.22 22.58 0.00 4.52 0.00 <br /> Nov-21 9.24 -7.61 9.07 7.78 0.00 7.78 <br /> Dec-21 5.22 -4.43 1.09 8.55 0.00 8.55 <br /> Jan-22 4.74 -3.40 0.00 8.14 0.00 8.14 <br /> Feb-22 5.32 -2.57 0.00 7.89 0.00 7.89 <br /> Mar-22 7.28 -2.47 0.00 9.75 0.00 9.75 <br /> 21-22 Total 214.34 201.12 221.60 54.20 40.98 54.20 <br /> Notes <br /> [1] Total lagged mining depletions from Table 1,column[13]. <br /> [2] HCU credits from Table 2,columns[12]and[13]. Negative values represent return flow obligation. <br /> [3] HCU credits are diverted through the Lester-Attebury Ditch to the Phase 1 pond where the water is recharged back to the river. <br /> Lagged HCU credits delivered to the River were projected based on lagging factors described in the 2020 SWSP. <br /> [4] Remaining replacement requirements calculated as follows-If[2]<0,equal to maximum of([1]-[2]-[3])and zero.If[2]>0,equal to maximum of <br /> ([1]-[3])and zero. <br /> [5] Excess credits calcualted as follows-If[4]>0,then 0,else[3]-[1]. <br /> [6] Reservoir release may be occur from Twin Lakes or from Pueblo Reservoir via administrative exchange. <br /> Twin Lakes releases will be assessed 10.3%transit loss based upon a loss of 0.07%per mile over 147.8 miles. <br /> ater a��.�iants .S J r � ASSOCIATES.' INC- <br /> Printed On:4/16/2020 PJB <br />