My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_REVISION - C1981028 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2020-05-26_REVISION - C1981028 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:16:47 AM
Creation date
5/26/2020 11:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
5/26/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd <br />Task # A01 <br />Page 29 of 29 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />BRIGHTON <br />Total one-way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />50.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$35,661.35 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$254.23 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): <br />0.40 0.40 <br />Return Time (Hours): <br />0.40 0.40 <br />Loading Time (Hours): <br />3.50 NA <br />Unloading Time (Hours): <br />3.50 NA <br />Subtotals: <br />7.80 0.80 <br />JOB TIME AND COST <br />Total job time: 15.60 Hours <br />Total job cost: $35,916 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.