Laserfiche WebLink
Scraper Worksheet Cont'd <br />Task # A01 <br />Page 29 of 29 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />BRIGHTON <br />Total one-way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />50.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />$35,661.35 <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$254.23 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable Roadable <br />Equipment Equipment <br />Haul Time (Hours): <br />0.40 0.40 <br />Return Time (Hours): <br />0.40 0.40 <br />Loading Time (Hours): <br />3.50 NA <br />Unloading Time (Hours): <br />3.50 NA <br />Subtotals: <br />7.80 0.80 <br />JOB TIME AND COST <br />Total job time: 15.60 Hours <br />Total job cost: $35,916 <br />CIRCES Cost Estimating Software <br />