My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_REVISION - C1981028 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2020-05-26_REVISION - C1981028 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:16:47 AM
Creation date
5/26/2020 11:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
5/26/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilization and Demobilization of Equipment <br />Site: Keenesburg Strip Mine Permit Action: SL 10 remaining Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: JO1 State: Colorado <br />Date: 5/20/2020 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: C28-JOI <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND I OOT) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$17.20 <br />$29.63 <br />$38.69 <br />Operating Cost/Hour: <br />$26.56 <br />$47.02 <br />$55.69 <br />Operator Cost/Hour: <br />$23.63 <br />$23.63 <br />$23.63 <br />Helper Cost/Hour: <br />$0.00 <br />$23.53 <br />$23.53 <br />Total Unit Cost/Hour: <br />$67.39 <br />$123.81 <br />$141.54 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />$81.32 <br />(TONS) <br />$81.32 <br />$81.32 <br />Lube Truck, 6x4, 250 HP <br />fleet <br />1 <br />$89.27 <br />Cat D9T - 9SU <br />66.13 <br />$135.43 <br />$141.54 <br />2 <br />$553.94 <br />$283.08 <br />$500.00 <br />ATLAS COPCO <br />1.25 <br />$70.87 <br />$67.39 <br />1 <br />$138.26 <br />$67.39 <br />$250.00 <br />ROC D7-11,4.0 <br />in. <br />CAT 14M <br />23.57 <br />$64.10 <br />$67.39 <br />1 <br />$131.49 <br />$67.39 <br />$250.00 <br />Cat 637G w/push- <br />59.59 <br />$174.06 <br />$141.54 <br />4 <br />$1,262.40 <br />$566.16 <br />$1,000.00 <br />pull <br />Subtotals: 1 $2,086.09 1 $984.02 1 $2,000.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ <br />unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Water Tanker, 2,500 Gal. <br />$65.88 <br />1 <br />$65.88 <br />$65.88 <br />Water Tanker, 3,500 Gal. <br />$81.32 <br />1 <br />$81.32 <br />$81.32 <br />Fuel Tanker, 6x4, 21011P <br />$81.32 <br />1 <br />$81.32 <br />$81.32 <br />Lube Truck, 6x4, 250 HP <br />$89.27 <br />1 <br />$89.27 <br />$89.27 <br />Subtotals: 1 $317.79 1 $317.79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.