Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Topsoil Long Term Spoil Area and Parcel 25 <br />Site: Keenesburg Strip Mine Permit Action: SL 10 remaining Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: E02 State: Colorado Abbreviation: None <br />Date: 5/20/2020 County: Weld Filename: C28 -E02 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker_ 3.500 Gal. <br />Cost Breakdown: Scraner Work Team Sunnort Fouinment Maintenance Fouinment <br />Total work team cost/hour: $2,435.44 <br />MATERIAL QUANTITIES <br />Initial volume: 123,965 CCY Swell factor: <br />Loose volume: 131,403 LCY <br />Source of estimated volume: Est. area of LTSP and Parcel 25 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />100 <br />100 <br />100 <br />100 <br />Ownership cost/hour: <br />$174.06 <br />NA <br />$121.49 <br />$121.49 <br />$64.10 <br />$13.51 <br />Operating cost/hour: <br />$190.35 <br />NA <br />$105.84 <br />$105.84 <br />$56.17 <br />$28.95 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />0 <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />$0.00 <br />$13.94 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$45.58 <br />NA <br />$39.98 <br />$39.98 <br />$45.39 <br />$38.86 <br />Unit Subtotals: <br />$409.98 <br />NA <br />$26731 <br />$281.24 <br />$165.66 <br />$81.31 <br />Number of Units: <br />4 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,639.92 <br />Support: <br />$548.55 <br />Maint: <br />$246.97 <br />Total work team cost/hour: $2,435.44 <br />MATERIAL QUANTITIES <br />Initial volume: 123,965 CCY Swell factor: <br />Loose volume: 131,403 LCY <br />Source of estimated volume: Est. area of LTSP and Parcel 25 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,850 lbs/LCY <br />Material description: <br />Sand - Damp <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />28.63 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />