My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_REVISION - C1981028 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2020-05-26_REVISION - C1981028 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:16:47 AM
Creation date
5/26/2020 11:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
5/26/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiencv: 0.830 NA (CAT HB) <br />Site Altitude: 4000 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />1600.00 <br />2.75 <br />3.00 <br />5.75 <br />1477 <br />1.16 <br />Haul Time: 1.16 minutes <br />Return Route - <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />1600.00 <br />-2.75 <br />3.00 <br />0.25 <br />2965 <br />0.65 <br />Return Time: <br />0.65 <br />minutes <br />Total Scraper team cycle time: <br />3.41 <br />minutes <br />Adjusted for job conditions: <br />836.28 <br />LCY/Hour <br />Selected Number of Scrapers: <br />4 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,672.55 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,672.55 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,007.56 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.410 /LCY <br />Total job time: 48.38 Hours <br />Total job cost: $114,072 <br />
The URL can be used to link to this page
Your browser does not support the video tag.