Laserfiche WebLink
May 18, 2020 C-2010-089/New Horizon North Mine JHB <br /> Meehan draw appeared dry. <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> The Irrigated pasture is green and being irrigated. The operator is completing regrading of the facilities <br /> area at the southern end of the permit. No problems were noted from these aerial photos. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> The operator is in the process of regrading the facilities area on the south end of the permit. <br /> TOPSOIL—Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Mixed topsoil stockpile No. 1 has dryland vegetative cover. No gully formation or problems with the <br /> containment ditch were obvious from the aerial photos. <br /> ERMR is regrading the facilities area at the south end of the permit area. A small amount of Progresso topsoil <br /> stockpile No. 1 has been utilized from the north east side of the permit area. The operator is also utilizing topsoil <br /> from the Mixed topsoil stockpile No. 2. <br /> DOCUMENTS RECEIVED NA <br /> OTHER(SPECIFY)NA <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 4 <br />