My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-20_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-05-20_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 8:18:29 AM
Creation date
5/21/2020 8:16:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
5/20/2020
Doc Name Note
SL20
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
SL20
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for a partial Phase III bond release for the 162.1 acre bond release block as per Table 3 below. This <br />proposed decision will release the applicant from Phase III reclamation liability for those SL20 <br />bond release parcels totaling 162.1 as shown in Table 2. <br />With the approval of the SL19 application the remaining reclamation liability was $21,222,905.74. <br />Upon approval of TR124 the total required surety was increased by $8,106,155.00 for an additional <br />201.4 acres of affected land. For the SL20 cost calculation, DRMS had to take into account the resultant <br />increase in the worst case scenario liability amount with the $8,106,155.00 cost increase from TR124. <br />The Pre-SL20 liability as a result is shown on Table 3. <br />Table 3. Pre SL20 Liabilitv <br />Table 3.1. Pre SL20 Phase Bond Release Acres <br />Phase <br />Bond <br />Release <br />Cost Increase <br />Phase 1 <br />4386.2 <br />Phase 2 <br />TR124 - Increase In Affected Land - 201.4 Acres <br />$8,106,155.00 <br />Acres <br />Cost/Acre <br />% <br />TR124 Cost <br />$27,931,079.12 <br />2631.61 <br />$10,613.68 <br />100% <br />$727,674.23 <br />$4,245. 47 <br />Phase I Bond Release <br />171.4 <br />40% <br />Phase II Bond Release <br />$1,091,192.94 <br />685.4 <br />$1,592.05 <br />15% <br />TR124 Resultant Cost Total <br />$29,749,946.29 <br />Table 3.1. Pre SL20 Phase Bond Release Acres <br />Phase <br />Bond <br />Release <br />Acreage <br />Phase 1 <br />4386.2 <br />Phase 2 <br />4214.8 <br />Phase 3 <br />3529.4 <br />When TR124 was approved the required surety amount was set at $29,329,060.74. This yields <br />a required surety deficit of $420,885.55 ($29,749,946.29 (-) $29,329,060.74). Using the <br />TR124 Resultant Cost Total as the baseline liability amount, DRMS calculated the reduction <br />in liability associated with the proposed approval of 162.1 acres for Phase III bond release <br />proposed with SL20. This calculation is shown on Table 4 below. <br />Permit Number C1981010 <br />SL20 Page 15 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.