Laserfiche WebLink
Page 12 <br /> • Page 3-43b to 3-43c. AOC variance discussion is added. <br /> • Page 3-45. The discussion of D/E Pit as a long term ash disposal site is removed. <br /> • Appendix A.Replace all existing bond information with the proposed PR-9 information, except <br /> existing TALPAC runs should be retained. <br /> • Appendix B. L and Ash Pits AOC Variance technical report information. <br /> • Map M4.The Life of Mine Plan map is updated. <br /> • Map M6.This 3-set Bonding map is updated. <br /> • Map M10A.This 3-set Mining and Regrade map is updated. <br /> • Map M1OB.This 3-set Topsoil Stripping and Reclaim map is updated. <br /> • Map M12.This 3-set Postmining Topography map is updated. <br /> • Map M14. This Drainage Profiles map series is updated in line with Map M12 changes. <br /> • Map M14A. This Pre and Post Mining Topography Cross-sections map is updated in line with <br /> Map M 12 changes. <br /> • Map M47A. Sheet 1 of this Utility Waste Disposal map is updated to remove D/E Pit from <br /> proposed ash disposal. <br /> Several permit map and page changes were approved in TR-124 that supersede changes proposed with the <br /> original PR-9 submittal.These changes include pages 3-15a, 3-15b, 3-44, 4-113,4-116,4-119 and 4- <br /> 226c; Tables 4-8-6 (pages 4-185,4-186 and 4-186a) and 4-8-7 (pages 4-189,4-190 and 4-190a); and Map <br /> M9 (sheet 2).The overlap PR-9 documents should be disregarded where these documents overlap with <br /> TR-124 approval. <br /> Please get back to us with any questions,comments or concerns. <br /> Sincerely, / <br /> Forrest Luke <br /> Environmental Manager <br /> Trapper Mining Inc. <br /> c PR-09 binder <br /> File 109.2.3.4 <br />