My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-13_REVISION - C1981010 (41)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-05-13_REVISION - C1981010 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 6:23:01 AM
Creation date
5/15/2020 6:48:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
5/13/2020
Doc Name Note
Proposed Adequacy Review No. 4
Doc Name
Adequacy Review Response
From
Trapper Mining Inc
To
DRMS
Type & Sequence
PR9
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAPPER MININD INC. <br /> P.O.Box 187 Craig,Colorado 81626 (970)824-4401 <br /> May 8,2020 RECEIVED <br /> 1 MAY 13 2020 <br /> �Ms. Robin ReilleY DIVISION OF RKL.AMATIOW <br /> Environmental Protection Specialist MINING AND SAFETY <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street,Room 215 <br /> Denver, CO 80203 <br /> Re: Trapper Mining Inc., Perinit No. C-1981-010 <br /> Permit Revision PR-09,Response to Adequacy Review No.4 <br /> Dear Ms. Reilley: <br /> Enclosed are two copies of our response to your letter of December 10, 2019 and to our meeting with you <br /> on the same date. We are referring to this as Adequacy Review No. 4 to Trapper's Permit Revision PR-09 <br /> application. The primary objectives of this response application are to address a variance from <br /> Approximate Original Contour(AOC) for L Pit and the A Pit ash area, and to submit an updated <br /> reclamation bond proposal. <br /> Comprehensive geotechnical and hydrologic studies were conducted by Agapito Associates,Inc. and <br /> JMattern Mining, LLC to address the AOC Variance proposal and are attached as Appendix B.New <br /> Permit Section 3.5.3.1 is added and, as applicable,references information in Appendix B. <br /> The updated bond estimate is based on a worst case bond situation at the end of 2022. Our bond estimate <br /> is increased over the most recent approved bond. Permit Section 1.4 and Appendix A are updated with the <br /> new bond information. <br /> Several other issues are addressed as outlined below. <br /> The following revised permit updates are enclosed: <br /> • Page i-7.Table of Contents page referencing new Section 3.5.3.1. <br /> • Page i-14. Table of Contents page referencing Appendix B. <br /> • Page iii-10. Table of Contents page referencing new Tables 3.5-1 and 3.5-2. <br /> • Pages 1-5 to 1-6. Trapper's officers and directors information is updated. <br /> • Pages 1-7 to 1-7c. Officers and directors of Trapper's owners are updated. <br /> • Pages 1-31 to 1-37. Bond is revised to reflect worst case permit term reclamation scenario. <br /> • Table 3.1-3 (page 3-13). Disturbance/reclamation table is updated. <br /> • Page 3-15. Mining sequence narrative is updated for D/E Pit. <br /> • Page 3-42. The discussion of specific drainages to be disturbed is updated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.