My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-13_PERMIT FILE - M2020022
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020022
>
2020-05-13_PERMIT FILE - M2020022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 7:08:33 PM
Creation date
5/15/2020 6:31:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020022
IBM Index Class Name
PERMIT FILE
Doc Date
5/13/2020
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Email Name
DC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environment, Inc. Page 3 <br /> Austin & Betsy Clennin - Becker Pit Adequacy 01 response <br /> Permit#M-2020-022 May 8, 2020 <br /> Exhibit B is not right, the discussion in Exhibit D page 25 is partially correct. I <br /> have revised Page 18 by taking out the "If needed" and have attached a new copy of <br /> Exhibit B for the files. I also clarified what was meant by "spread" in Exhibit D <br /> and provided an updated version for the file. Thank you for catching this. <br /> 6. The Division has reviewed the Operators reclamation cost estimate and agrees with <br /> $27,000.00 suggested. <br /> Thank you. <br /> 6.3.5 EXHIBIT E—Map <br /> 7. Rule 6.3.5(h) requires the average thickness of replaced overburden be stated on the <br /> reclamation plan map. Please resubmit the reclamation plan map with the required <br /> information. <br /> There is no overburden on this mine only the soil and the sand and gravel underlaying <br /> it. So non will need to be respread. <br /> 8. Rule 6.3.5(e) requires the average thickness of replaced topsoil by area or phase be stated on <br /> the reclamation plan map. Please resubmit the reclamation plan map with the required <br /> information. <br /> I added a note to the map as you suggest. <br /> 9. Rule 6.3.5(2)(b) requires the type of structure and owners of record of any permanent or <br /> man-made structures within two hundred of the affected area be labeled on the Mining Plan <br /> Map. Please resubmit the Mining Plan Map labeling the road and barbed wire fence with the <br /> required information. <br /> I added labels to the structures showing the owners to the map as you suggest. <br /> 6.3.12 EXHIBIT L - Permanent Man-Made Structures <br /> 10. Page 35 of Exhibit L states "Structure agreements will be provided to the Division of <br /> Reclamation, Mining& Safety when received". The division needs the structure <br /> agreement before the application can be approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.