Laserfiche WebLink
Communication 8' x 10' x Bldg. (SN) 960.00 CF $0.19 $180.48 <br />Building - 12' demo./on-site <br />Security Area disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Main 100' Powerline or 3.00 EA $1,701.00 $5,103.00 <br />Communication utility line - <br />Tower Structural Steel <br />Box Type Frame <br />Structure <br />Dismantle and <br />Dispose <br />Main 25 CY Demo. and on-site 4.00 LF $10.39 $41.54 <br />Communication disposal in <br />Tower Pad existing pit, 2.0 ft. <br />x 3 ft. - Max. 50 <br />ft. push <br />Meteorological 30' Powerline or 1.00 EA $1,701.00 $1,701.00 <br />Station utility line - <br />Structural Steel <br />Box Type Frame <br />Structure <br />Dismantle and <br />Dispose <br />Meteorological 4 CY Demo. and on-site 2.00 LF $3.46 $6.92 <br />Station Pad disposal in <br />existing pit, 1.0 ft. <br />x 2 ft. - Max. 50 <br />ft. push <br />Remove Power 16,897' OBSOLETE - 16,897.00 LF $0.09 $1,520.73 <br />Lines Powerline or <br />utility line, line <br />disposal only <br />Remove Collom 9,617' OBSOLETE - 9,617.00 LF $0.09 $865.53 <br />Haul Road Powerline or <br />Power Lines utility line, line <br />disposal only <br />Remove Crew 8' x 24' x Bldg. (SN) 2,304.00 CF $0.20 $467.71 <br />Trailer 12' demo./on-site <br />disposal in <br />excavated pit - <br />Max. 10,000 ft. <br />haul <br /> <br />Total Cost <br />Subtotal (adjusted for <br />(unadjusted): location): <br />Job Hours: 60.00 $278,922.56 $266,371.04 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />