Laserfiche WebLink
in. to 24 in. thick - <br />No reinforcing <br />Demo Facilities N/A Floor, concrete, 7,750.00 SF $1.44 $11,160.00 <br />Concrete demolition only, 6 <br />in. thick - No <br />reinforcing <br />Water Tank 35' dia Bldg. (MN) 279,941.00 CF $0.22 $60,187.32 <br />demo./on-site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />ANFO Silo #1 10' dia x 20' Bldg. (MN) 6,283.00 CF $0.22 $1,350.85 <br />demo./on-site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />ANFO Silo #2 10' dia x 20' Bldg. (MN) 6,283.00 CF $0.22 $1,350.85 <br />demo./on-site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />ANFO Silo #3 10' dia x 20' Bldg. (MN) 6,283.00 CF $0.22 $1,350.85 <br />demo./on-site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Electrical 80' x 80' x Bldg. (SN) 76,800.00 CF $0.19 $14,438.40 <br />Substation 12' demo./on-site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Communications 20' x 20' x Bldg. (SN) 4,800.00 CF $0.19 $902.40 <br />Building 12' demo./on-site <br />disposal in <br />existing pit or cut - <br />Max. 10,000 ft. <br />haul <br />Remove Taylor 150' Pipe, steel, welded 150.00 LF $6.37 $955.50 <br />Creek Elevated connections - 10 <br />Pipe in. diameter pipe <br />Remove 1.5' x 2' Footing, concrete, 16.00 LF $5.10 $81.68 <br />Elevated Pipe average <br />Footers reinforcing - 1.5 ft. <br />x 2 ft. <br />15 Collom 20' Utility Poles, 15.00 EA $220.50 $3,307.50 <br />Power Poles Wood 20' to 0' <br />high (each pole) <br />Communication 8' x 10' x Bldg. (SN) 960.00 CF $0.19 $180.48 <br />Building - 12' demo./on-site <br />Collom disposal in <br />Substation existing pit or cut - <br />Max. 10,000 ft. <br />haul <br /> <br />