My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-05-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:53 PM
Creation date
5/12/2020 6:26:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/6/2020
Doc Name
Findings & Cost Estimate
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
034 Regrade Topsoil for Ditch D4 DOZER 1 0.14 $63 <br />035 Regrade Topsoil for Ditch D5 DOZER 1 0.78 $351 <br />036 Regrade Topsoil for Ditch D6 DOZER 1 1.22 $552 <br />037 Regrade Topsoil for West Side Pond Access Road DOZER 1 3.93 $1,777 <br />038 Regrade Topsoil for East Side Pond Access Road DOZER 1 3.93 $1,777 <br />039 Regrade Topsoil for Topsoil Access Road DOZER 1 26.50 $11,975 <br />040 Regrade Topsoil for Temporary North Access Road DOZER 1 8.89 $4,016 <br />041 Regrade Topsoil for Temporary South Access Road DOZER 1 8.89 $4,016 <br />042 Regrade Topsoil for Tie-In Road Access Road DOZER 1 1.27 $574 <br />043 Reseed Collom Access Roads REVEGE 1 16.00 $9,344 <br />044 Regrade Topsoil for Raw Water Line DOZER 1 14.02 $6,641 <br />045 Reseed Collom Raw Water Line REVEGE 1 16.50 $9,332 <br />046 Load, Haul and Regrade Collom Spoil TRUCK1 1 3,533.23 $15,990,473 <br />047 Load, Haul and Regrade Collom Topsoil TRUCK1 1 249.90 $1,135,773 <br />048 Reseed Collom Pit and Temporary Spoil Pile REVEGE 1 251.00 $160,189 <br />049 Reseed Collom Topsoil Pile Footprints 26A, 26B and REVEGE 1 15.25 $8,715 <br />36A <br />050 Regrade Topsoil for Taylor Creek Pipe Crossing DOZER 1 2.46 $1,192 <br />051 Reseed Taylor Creek Pipe Crossing Disturbance REVEGE 1 5.00 $3,000 <br />052 Reseed Collom Facility Area REVEGE 1 251.00 $83,347 <br />053 Collom-Weed control 10% of 1133.4 ac. 3X REVEGE 1 120.00 $39,991 <br />054 Mobilize/demobilize equipment from Craig MOBILIZE 1 6.44 $119,253 <br />055 Plug and Seal All Wells for Collom (MR203) BOREHOLE 1 24.00 $12,696 <br />056 Regrade Topsoil for Power Disturbution and Light-use DOZER 1 11.58 $6,647 <br />Road <br />057 Reseed Power Distribution and Associated Light-Use REVEGE 1 7.30 $17,943 <br />Road <br />058 Regrade Ditch CWD-1 DOZER 1 12.95 $2,415 <br />059 Regrade Topsoil for Ditch CWD-1 DOZER 1 5.50 $2,670 <br />060 Reseed Ditch CWD-1 REVEGE 1 4.30 $1,202 <br /> <br /> <br />6238.23 $22,783,400 <br /> <br />SUBTOTALS: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.