Laserfiche WebLink
<br />COST SUMMARY WORK <br /> <br />Task description: <br />Collom Cumulative Bond (MT8) <br /> <br />Site: Permit Action: 13C (MT8) Permit/Job#: C1981019 <br />Colowyo Coal Mine <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 4/18/2020 County: Moffat Filename: C019-000 <br />User: ZTT <br /> <br /> <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br /> <br /> Form Fleet <br />Task <br />Task <br />Hours Cost <br />Description Used Size <br />001 Remove Collom Haul Road and Facility Culverts DEMOLISH 1 24.00 $75,494 <br />(MR203) <br />002 Demo Collom Facilities and Haul Road Crossing DEMOLISH 1 60.00 $266,371 <br />(MR192,TR121) <br />003 Rip 29,458' of Collom Haul Road RIPPER 2 12.69 $13,700 <br />004 Haul/Regrade Spoil to Collom Haul Road: 00+00 - SCRAPER1 4 93.23 $487,761 <br />208+00 <br />005 Haul/Regrade Spoil to Collom Haul Road: 208+00 - SCRAPER1 4 215.09 $1,125,284 <br />282+00 <br />006 Haul/Regrade Spoil to Collom Haul Road: 282+00 - SCRAPER1 4 204.35 $1,050,972 <br />395+00 <br />007 Haul/Regrade Topsoil to Collom Haul Road: 112+26 - SCRAPER1 4 12.66 $66,228 <br />149+00 <br />008 Haul/Regrade Topsoil to Collom Haul Road: 149+00 - SCRAPER1 4 35.29 $184,640 <br />222+20 <br />009 Haul/Regrade Topsoil to Collom Haul Road: 222+20 - SCRAPER1 4 2.76 $14,447 <br />242+00 <br />010 Haul/Regrade Topsoil to Collom Haul Road: 242+00 - SCRAPER1 4 6.81 $35,631 <br />275+20 <br />011 Haul/Regrade Topsoil to Collom Haul Road: 275+20 - SCRAPER1 4 11.25 $50,761 <br />298+10 <br />012 Haul/Regrade Topsoil to Collom Haul Road: 298+10 - SCRAPER1 4 10.96 $49,433 <br />336+00 <br />013 Haul/Regrade Topsoil to Collom Haul Road: 336+00 - SCRAPER1 4 27.23 $122,836 <br />396+89 <br />014 Reseed Collom Haul Road REVEGE 1 116.35 $64,115 <br />015 Regrade Collom Facility Area DOZER 4 523.23 $991,339 <br />016 Load/Haul/Regrade Topsoil to Collom Facility from TS TRUCK1 1 118.19 $475,186 <br />25A <br />017 Section 25 Pond Removal DOZER 1 13.49 $6,095 <br />018 Middle Pond Removal DOZER 1 4.95 $2,239 <br />019 Section 36 Pond Removal DOZER 1 8.09 $3,657 <br />020 Section 26 Pond Removal DOZER 1 12.19 $5,508 <br />021 Sidehill Pond Removal DOZER 1 23.21 $10,487 <br />022 Coal Stockpile Pond Removal DOZER 1 63.87 $28,860 <br />023 Temporary Facilities Pond Removal DOZER 1 4.73 $2,136 <br />024 Wilson Storage Pond Removal DOZER 1 15.80 $7,141 <br />025 Regrade Ditch D1 DOZER 1 1.72 $779 <br />026 Regrade Ditch D2 DOZER 1 3.13 $1,413 <br />027 Regrade Ditch D3 DOZER 1 1.78 $804 <br />028 Regrade Ditch D4 DOZER 1 1.27 $575 <br />029 Regrade Ditch D5 DOZER 1 3.14 $1,417 <br />030 Regrade Ditch D6 DOZER 1 3.08 $1,394 <br />031 Regrade Topsoil for Ditch D1 DOZER 1 0.27 $122 <br />032 Regrade Topsoil for Ditch D2 DOZER 1 1.25 $563 <br />033 Regrade Topsoil for Ditch D3 DOZER 1 0.19 $88 <br /> <br />