My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-05-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:53 PM
Creation date
5/12/2020 6:26:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/6/2020
Doc Name
Findings & Cost Estimate
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The additional study data will be forwarded to the Colorado <br />Historic Society for their evaluation and a determination of the <br />proper course of action required. <br /> <br />Stipulation 4 Prior to disturbing the Lower Wilson area the Colowyo Coal <br />Company shall perform further archaeological investigations on the <br />Additionally, Colowyo will be required to survey any other areas <br />that are determined to have no survey or inadequate survey data. <br />The six unsurveyed areas shown on Map 16A are all within <br />Township 4 North Range 93 West and are basically described as <br />follows: <br /> SW¼ SW¼ Section 15 <br /> <br /> SW¼ SW¼ Section 22 <br /> <br /> SE¼ NE¼ Section 28 <br /> <br /> SW¼ SE¼ Section 28 <br /> <br /> E½ NW¼ Section 33 <br /> <br /> W½ SW¼ Section 33 <br /> <br />The additional study data will be forwarded to the Colorado Historic <br />Society for their evaluation and a determination of the proper course <br />of action required. <br /> <br />Stipulation 7 The Colowyo Coal Company shall submit a TECHNICAL revision <br />to the Division which provides an analysis of groundwater points <br />of compliance at the Colowyo Mine pursuant to Rule 4.05.13(1). <br />This analysis will be done in consultation with the Division and <br />will include a written determination of the need for groundwater <br />points of compliance at the mine. If deemed appropriate, based on <br />this analysis, Colowyo shall establish one or more points of <br />compliance for the Colowyo Mine. <br /> <br />Stipulation 19 The Colowyo Coal Company shall submit a TECHNICAL revision <br />to the Division which provides an analysis of groundwater points <br />of compliance at the Colowyo Mine pursuant to Rule 4.05.13(1). <br />This analysis will be done in consultation with the Division and <br />will include a written determination of the need for groundwater <br />points of compliance at the mine. If deemed appropriate, based on <br />this analysis, Colowyo shall establish one or more points of <br />compliance for the Colowyo Mine. <br /> <br />Colowyo Mine Midterm Review No. 8 <br />Permit No. C-1981-019 May 5, 2020 <br /> 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.