Laserfiche WebLink
ENVIRONMENT, INC. PAGE 6 <br /> L.G. EVERIST, INC. - RAGSDALE RESERVOIR ADEQUACY RESPONSE O 1 <br /> MAY 6, ZOZ❑ <br /> L.G. Everist, Inc., understands that should any of the mined area be reclaimed as wetlands <br /> that a Technical Revision will be filed requesting the change, and an augmentation plan to <br /> cover and replace the evaporative losses on the wetland areas will be obtained prior to <br /> release of those areas from the permit. <br /> Post mining revegetation will need to be established and largely <br /> weed-free prior to release of an area from the DRMS permit . No <br /> "reasonable assurance" exceptions as described in the permit <br /> application will be made . Please plan accordingly. <br /> L.G. Everist, Inc., will plan on completing reclamation of the reservoir areas as described <br /> and including established revegetation prior to requesting a release on any complete areas. <br /> The permittee is responsible to DRMS for maintaining the entire <br /> permit area in compliance with all applicable rules and require- <br /> ments, including weed control within the permit area. Any outside <br /> agreements between the permittee and other parties for site use <br /> and/or maintenance will be the permittee' s responsibility to <br /> enforce . <br /> L.G. Everist, Inc., understands it is the permittee's responsibility to maintain the permit area <br /> in compliance with all applicable rules and requirements, including weed control during the <br /> life of the mine and until reclamation is completed and the permit area is released in full or <br /> part. <br /> EXHIBIT F - Reclamation Plan Map (Rule 6.4. 6) : What is the fine <br /> green line around Phase 4B and on the north end of Phase lA <br /> depicting? <br /> That is just the outline of the hatch marks designating the area to be planted. On <br /> my map is shows up as a black line. I have changed it to black on the revised maps <br /> to match the hatch color. <br /> Please show the locations of the required flood inlet/outlet <br /> structures in Phases 1 and 2 . <br /> As mentioned above, no inlet/outlet structures will be built on this facility. It is not <br /> L.G. Everist's responsibility to bridge the gap between the permit area and the river's <br /> edge. The permit area is setback 135 to 185 feet from the west side of the armored <br /> berm along the river. The Division is asking the applicant to expand the permit area <br /> by asking the applicant to build inlet/outlet structures. <br /> The landowners do not want inlet/outlet structures, which is why they have not been <br /> added to the Mining and Reclamation Plans and Maps. However, if the landowners <br /> determine the need for inlet/outlet structures prior to permit release, and if the <br /> structures are added within the permit area, then a Technical Revision will be filed <br /> showing the design and layout for such inlet/outlet structures. <br />