Laserfiche WebLink
Cripple Creek <br /> AFNewmiont Gold Mining Company F 719.689.3254 <br /> ��North 31d Street newmont.corn <br /> . <br /> ColoradoP.O.Box 191 <br /> :0:.0 <br /> As reported on January 30,2020, CC&V collected first quarter compliance groundwater samples from monitoring <br /> well GVMW-8A and SGMW-613 on January 20, 2020. CC&V received the lab report for these analyses on January <br /> 28, 2020, and upon review, determined that GVMW-8A exceeded established numeric protection limits for <br /> fluoride and SGMW-6B exceeded established numeric protection limits for fluoride, manganese, and sulfate. <br /> Table 2 below lists the exceedance for the location and the associated parameter. <br /> Table 2. <br /> Location Sample Date Parameter Value NPL(mg/L) Table Standard <br /> (mg/L) (mg/L) <br /> GVMW-8A 1/20/2020 Fluoride 2.15 2.0 2.0 <br /> SGMW-6B 1/20/2020 Fluoride 8.76 2.0 2.0 <br /> SGMW-6B 1/20/2020 Manganese 6.82 3.0 0.05 <br /> SGMW-613 1/20/2020 Sulfate 925 250 250 <br /> As reported on February 3,2020, CC&V collected first quarter compliance groundwater samples from monitoring <br /> well CRMW-5B and PGMW-3 on January 21,2020. CC&V received the lab report for these analyses on January 29, <br /> 2020, and upon review, determined that CRMW-5B exceeded established numeric protection limits for fluoride <br /> and PGMW-3 exceeded established numeric protection limits for aluminum, cadmium, copper, fluoride, <br /> manganese, nitrate as N, nitrite+ nitrate as N,pH,and sulfate. Table 3 below lists the exceedance for the location <br /> and the associated parameter. <br /> Table 3. <br /> Location Sample Date Parameter Value(mg/L) NPL(mg/L) Table Standard <br /> (mg/L) <br /> CRMW-36 1/21/2020 Fluoride 2.93 2.0 2.0 <br /> PGMW-3 1/21/2020 Aluminum 14.1 7.0 5.0 <br /> PGMW-3 1/21/2020 Cadmium 0.0114 0.005 0.005 <br /> PGMW-3 1/21/2020 Copper 0.885 0.20 0.20 <br /> PGMW-3 1/21/2020 Fluoride 2.71 2.0 2.0 <br /> PGMW-3 1/21/2020 Manganese 12.1 3.0 0.05 <br /> PGMW-3 1/21/2020 Nitrate as N 13.3 10.0 10.0 <br /> PGMW-3 1/21/2020 Nitrite+Nitrate as 13.3 11.0 10.0 <br /> PGMW-3 1/21/2020 pH 4.32 6.0 6.5 <br /> PGMW-3 1/21/2020 Sulfate 511 250 250 <br /> As reported on February 17, 2020, CC&V collected first quarter compliance groundwater samples from <br /> monitoring wells CRMW-5C on January 27,2020,and WCMW-6 on January 28,2020. CC&V received the lab report <br /> for these analyses on February 11, 2020, and February 12, 2020, respectively. Upon review, CC&V determined <br /> that CRMW-5C and WCMW-6 exceeded established numeric protection limits for fluoride. Table 4 below lists the <br /> exceedance for the location and the associated parameter. <br />