My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-03-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2020 3:37:49 PM
Creation date
5/6/2020 9:38:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/31/2020
Section_Exhibit Name
Table of Contents -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />4.05.1 <br />General Requirements..................................................................................................3 <br />4.05.3 <br />4.05.4 <br />Diversions and Conveyance of a Watershed Less than One Square Mile....................3 <br />Stream Channel Diversions (Relocation of Streams)...................................................3 <br />4.05.5 <br />Sediment Control Measures..........................................................................................4 <br />4.05.6 <br />Sedimentation Ponds....................................................................................................4 <br />4.05.7 <br />Discharge Structures.....................................................................................................6 <br />4.05.8 <br />Acid-forming and Toxic -Forming Spoil.......................................................................6 <br />4.05.9 <br />Post -Mining Impoundments.........................................................................................6 <br />4.05.10 <br />Underground Mine Entry and Access Discharges........................................................6 <br />4.05.11 <br />Groundwater Protection...............................................................................................6 <br />4.05.12 <br />Protection of Groundwater Recharge Capacity...........................................................6 <br />4.05.13 <br />Surface and Groundwater Monitoring..........................................................................6 <br />4.05.14 — <br />4.05.18 Various Topics.................................................................................................................7 <br />4.06 <br />TOPSOIL.........................................................................................................................7 <br />4.07 <br />SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS ....................7 <br />4.08 <br />USE OF EXPLOSIVES...................................................................................................7 <br />4.08.2 <br />Pre -Blast Survey...........................................................................................................7 <br />4.09 <br />DISPOSAL OF EXCESS SPOIL....................................................................................7 <br />4.10-4.12 <br />DISPOSAL OF EXCESS SPOIL....................................................................................9 <br />4.13 <br />CONTEMPORANEOUS RECLAMATION...................................................................9 <br />4.14 <br />BACKFILLING AND GRADING................................................................................10 <br />4.14.1 <br />General Requirements................................................................................................10 <br />4.14.2 <br />General Grading Requirements..................................................................................10 <br />4.14.3 <br />Covering Coal and Acid and Toxic Forming Materials.............................................11 <br />4.14.4 <br />Thin Overburden........................................................................................................11 <br />4.14.5 <br />Thick Overburden....................................................................................................... <br />11 <br />4.14.6 <br />Re -grading or Stabilizing Rills and Gullies ....................................... <br />4.15 <br />REVEGETATION REQUIREMENTS.........................................................................11 <br />4.15.1 — 4.15.7 Revegetation Requirements, Various......................................................................... <br />11 <br />4.15.8 <br />Revegetation Success Criteria....................................................................................11 <br />4.15.9 <br />Cropland Revegetation Success.................................................................................. <br />11 <br />4.15.10 <br />Previously Mined Land Revegetation Success Criteria .............................................. <br />11 <br />4.16 <br />POSTMINING LAND USE..........................................................................................12 <br />4.16.1 <br />General.......................................................................................................................12 <br />4.16.2 <br />Determining Use of Land...........................................................................................12 <br />4.16.3 <br />Alternative Land Uses................................................................................................12 <br />4.17 <br />AIR RESOURCES PROTECTION...............................................................................12 <br />4.18 <br />PROTECTION OF FISH, WILDLIFE, AND RELATED VALUES ...........................12 <br />4.19 <br />PROTECTION OF UNDERGROUND MINING.........................................................13 <br />4.20 <br />SUBSIDENCE CONTROL...........................................................................................13 <br />4.21 <br />COAL EXPLORATION................................................................................................13 <br />4.22 <br />CONCURRENT SURFACE AND UNDERGROUND MINING................................13 <br />4.23 AUGER AND HIGHWALL MINING...............................................................................................13 <br />4.23.1 <br />Scope..........................................................................................................................13 <br />4.23.2 <br />Maximize Recoverability of Mineral Reserves..........................................................13 <br />4.23.2(2) <br />Abandoned or Active Underground Mine Workings.................................................................14 <br />4.23.2(3) <br />Surface Mining Activities and Highwall Mining.......................................................................14 <br />4.23.2(4) <br />Prevent Pollution of Surface and Groundwater and to Reduce Fire Hazards ............................14 <br />4.23.2(6) <br />Division Shall Prohibit Auger (Highwall Mining) Mining........................................................15 <br />4.23.2(7) <br />Backfill and Grading Requirements...........................................................................................15 <br />4.24 <br />OPERATIONS IN ALLUVIAL VALLEY FLOORS...................................................15 <br />South Taylor/Lower Wilson - iii Revision Date: 7/23/18 <br />Revision No.: TR -123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.