My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-31_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-03-31_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2020 3:37:49 PM
Creation date
5/6/2020 9:38:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/31/2020
Section_Exhibit Name
Table of Contents -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />2.05.3 (5) <br />Topsoil..................................................................................................................................80 <br />2.05.3 (6) <br />Overburden..........................................................................................................................81 <br />2.05.3 (7) <br />Coal Handling Structures..................................................................................................... 84 <br />2.05.3 (8) <br />Coal Mine Waste and Non -Coal Processing Waste.............................................................84 <br />2.05.3 (9) <br />Return of Coal Mine Waste to Abandoned Workings..........................................................84 <br />2.05.4(l) <br />Reclamation Plan.................................................................................................................. <br />85 <br />2.05.4 (2)(a) <br />Reclamation Timetable.........................................................................................................85 <br />2.05.4 (2)(b) <br />Reclamation Costs................................................................................................................85 <br />2.05.4 (2)(c) <br />Backfilling Plan....................................................................................................................86 <br />2.05.4 (2)(d) <br />Topsoil Salvage.................................................................................................................... <br />86 <br />2.05.4 (2)(e) <br />Reclamation Revegetation....................................................................................................91 <br />2.05.4 (2)(f -h) <br />Disposal, Mine Openings, Water and Air Control............................................................102 <br />2.05.5 <br />Post -Mining Land Uses......................................................................................................103 <br />2.05.6 <br />Mitigation of Impacts of Mining Operations...................................................................... <br />106 <br />2.05.6(l) <br />Air Pollution Contol Plan...................................................................................................106 <br />2.05.6 (2) <br />Fish and Wildlife Plan........................................................................................................106 <br />2.05.6 (3)(a) <br />Protection of the Hydrologic Balance................................................................................109 <br />2.05.6 (3)(b)(i & ii) Hydrologic Controls.................................................................................................110 <br />2.05.6 (4) <br />Protection of Public Parks and Historic Places..................................................................126 <br />2.05.6 (5-6) <br />Surface Mining near Underground Mining; Subsidence Control.......................................126 <br />2.06 <br />PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES ................................127 <br />2.06.1-3 <br />Scope, Experimental Mining, and Mountain Top Removal...............................................127 <br />2.06.4 <br />Steep Slope Mining............................................................................................................127 <br />2.06.5 <br />Variance from Approximate Original Contour Restoration Requirements ........................127 <br />2.06.6 <br />Prime Farmlands................................................................................................................127 <br />2.06.7 <br />Reclamation Variance........................................................................................................127 <br />2.06.8 <br />Alluvial Valley Floor(AVF)..............................................................................................127 <br />2.06.9 — 2.06.11 Augering, Processing Plants, In -Situ Processing .....................................................132 <br />2.06.12.1 <br />Coal Refuse Piles...............................................................................................................132 <br />2.07-2.10 <br />VARIOUS..........................................................................................................................132 <br />RULE3 — PERFORMANCE BOND............................................................................................................1 <br />RULE 4 — PERFORMANCE STANDARDS...............................................................................................1 <br />4.02 <br />SIGNS AND MARKERS......................................................................................................1 <br />4.02.1 <br />Specifications.........................................................................................................................1 <br />4.02.2 <br />Mine and Permit Identification Signs..................................................................................... <br />l <br />4.02.3 <br />Perimeter Markers..................................................................................................................1 <br />4.02.4 <br />Duration of Maintenance........................................................................................................ <br />l <br />4.02.5 <br />Stream Buffer Zone Markers.................................................................................................. <br />l <br />4.02.6 <br />Blasting Signs......................................................................................................................... <br />4.02.7 <br />Topsoil Markers.....................................................................................................................1 <br />4.03 <br />ROADWAYS........................................................................................................................1 <br />4.03.1 <br />Haul Roads.............................................................................................................................1 <br />4.03.2 <br />Access Roads..........................................................................................................................2 <br />4.03.3 <br />Light -Use Roads.....................................................................................................................3 <br />4.04 <br />SUPPORT FACILITIES........................................................................................................3 <br />4.05 <br />HYDROLOGIC BALANCE..................................................................................................4 <br />4.05.1 <br />General Requirements............................................................................................................4 <br />4.05.2 <br />Water Quality Standards and Effluent Limitations................................................................4 <br />4.05.3 <br />Diversions and Conveyance of a Watershed Less than One Square Mile ..............................4 <br />4.05.4 <br />Stream Channel Diversions (Relocation of Streams).............................................................4 <br />4.05.5 <br />Sediment Control Measures...................................................................................................4 <br />ii Revision Date: 5/25/18 <br />Revision No.: RN -07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.