Laserfiche WebLink
SEDCAD 4 for Windows <br /> (`nrninnht 1 OOP-9M f1 PAMAla I Crhwah <br /> 26 <br /> Combined <br /> Elevation Emergency Total <br /> (ft) Spillway(cfs) Discharge <br /> (cfs) <br /> 7,378.00 0.000 0.000 <br /> 7,378.50 0.000 0.000 <br /> 7,379.00 0.000 0.000 <br /> 7,379.50 0.000 0.000 <br /> 7,380.00 0.000 0.000 <br /> 7,380.50 0.000 0.000 <br /> 7,381.00 0.000 0.000 <br /> 7,381.50 0.000 0.000 <br /> 7,382.00 0.000 0.000 <br /> 7,382.50 0.000 0.000 <br /> 7,383.00 0.000 0.000 <br /> 7,383.50 0.000 0.000 <br /> 7,384.00 0.000 0.000 <br /> 7,384.50 0.000 0.000 <br /> 7,385.00 0.000 0.000 <br /> 7,385.50 0.000 0.000 <br /> 7,386.00 0.000 0.000 <br /> 7,386.50 0.000 0.000 <br /> 7,387.00 0.000 0.000 <br /> 7,387.50 0.000 0.000 <br /> 7,388.00 0.000 0.000 <br /> 7,388.50 0.000 0.000 <br /> 7,389.00 0.000 0.000 <br /> 7,389.50 3.625 3.625 <br /> 7,390.00 48.400 48.400 <br /> Structure #8(Riprap Channel) <br /> T Tab Ditch Sta 10 to 0 <br /> Trapezoidal Riprap Channel Inputs: <br /> Material: Riprap <br /> Left Right Freeboard <br /> Bottom Freeboard Freeboard <br /> Sideslope Sideslope Slope(%) <br /> Width(ft) Ratio Ratio Depth (ft) %of Depth Mult.x <br /> (VxD) <br /> 12.00 2.0:1 2.0:1 21.3 1.00 <br /> Riprap Channel Results: <br /> Simnne/OSM Method - Step Slope_Design <br /> Filename: Prospect Pond 25 Yr 24 Hr Storm Event.sc4 Printed 01-06-2020 <br />