Laserfiche WebLink
SEDCAD 4 for Windows <br /> (^nrwrinhf 1 QQR-7f11 n PamAla I Criumah <br /> 25 <br /> Pond Results: <br /> 410 Peak Elevation: 7,389.35 ft <br /> Dewater Time: 0.51 days <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 7,378.00 0.041 0.000 0.000 <br /> 7,378.50 0.055 0.024 0.000 <br /> 7,379.00 0.071 0.055 0.000 <br /> 7,379.50 0.083 0.094 0.000 <br /> 7,380.00 0.096 0.138 0.000 <br /> 7,380.50 0.107 0.189 0.000 <br /> 7,381.00 0.119 0.245 0.000 <br /> 7,381.50 0.131 0.308 0.000 <br /> 7,382.00 0.143 0.376 0.000 <br /> 7,382.50 0.155 0.451 0.000 <br /> 7,383.00 0.168 0.531 0.000 <br /> 7,383.50 0.181 0.618 0.000 <br /> 7,384.00 0.194 0.712 0.000 <br /> 7,384.50 0.207 0.812 0.000 <br /> 7,385.00 0.220 0.919 0.000 <br /> 7,385.50 0.233 1.032 0.000 <br /> 7,386.00 0.247 1.152 0.000 <br /> 7,386.50 0.261 1.279 0.000 <br /> 7,387.00 0.275 1.413 0.000 <br /> 7,387.50 0.289 1.554 0.000 <br /> 7,388.00 0.304 1.702 0.000 <br /> 7,388.50 0.319 1.858 0.000 <br /> 7,389.00 0.334 2.021 0.000 Spillway#1 <br /> 7,389.35 0.359 2.145 2.570 12.20 Peak Stage <br /> 7,389.50 0.366 2.196 3.625 <br /> 7,390.00 0.400 2.388 48 400 <br /> Detailed Discharge Table <br /> Filename: Prospect Pond 25 Yr 24 Hr Storm Event.sc4 Printed 01-06-2020 <br />