My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-15_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2020-04-15_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 6:50:28 AM
Creation date
4/17/2020 6:40:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
4/15/2020
Doc Name
Request for Technical Revision
From
Ouray Silver Mines, Inc.
To
DRMS
Type & Sequence
TR11
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential—Attorney Client Communication Geo syntec° <br /> COIlsultaIIts <br /> 6. REFERENCES 38 <br /> LIST OF TABLES <br /> Table 1: Mine Site Conditions for Design Considerations <br /> Table 2: Water Quality Discharge Limits <br /> Table 3: Treatability Testing Report Structure and Objectives <br /> Table 4: Approximate Volumetric Capacity of Water System <br /> Table 5: Water System Residence Times <br /> Table 6: Overview of Testing <br /> Table 7: Coagulation/Flocculation/Sedimentation Jar Testing Summary <br /> Table 8: Manganese Removal Jar Testing Summary <br /> Table 9: Pilot-Scale Design in the Work Plan <br /> Table 10: Zinc Percent Removal <br /> LIST OF FIGURES <br /> Figure 1: Mine Discharge Water Flow Data <br /> Figure 2: Process Flow Diagram <br /> Figure 3: Preliminary Bench-and Pilot-Testing Schedule <br /> Figure 4: Jar Testing Apparatus for Jar Test 1 <br /> Figure 5: Jar Testing Apparatus for Pre-Treatment Adsorptive Media Jar Test <br /> Figure 6: Pilot-Scale Test Schematic <br /> Figure 7: Pilot Testing Chemical Dosing Setup <br /> Figure 8: MRI Unit Testing Setup <br /> Figure 9: Total Fe System Snapshot <br /> Figure 10: Total Zn System Snapshot <br /> Figure 11: Recommended Process Flow Diagram <br /> Treatability Testing Report viii December 11,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.