My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-15_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2020-04-15_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 6:50:28 AM
Creation date
4/17/2020 6:40:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
4/15/2020
Doc Name
Request for Technical Revision
From
Ouray Silver Mines, Inc.
To
DRMS
Type & Sequence
TR11
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential—Attorney Client Communication Geosyntec p <br /> Consultants <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION 1 <br /> 1.1 Overview 1 <br /> 1.2 Mine Background 1 <br /> 1.3 Treated Water Discharge Limits 4 <br /> 1.4 Treatability Testing Report 5 <br /> 2. TREATMENT SYSTEM OVERVIEW AND TREATABILITY TESTING <br /> METHODS 6 <br /> 2.1 Overview 6 <br /> 2.2 Bench-Scale Testing 9 <br /> 2.2.1 Bench-Scale Source Water 10 <br /> 2.2.2 Bench-Scale Coagulation/Flocculation/Settling 10 <br /> 2.2.3 Bench-Scale Manganese Removal 11 <br /> 2.2.4 Bench-Scale Adsorptive Media 12 <br /> 2.3 Pilot-Scale Testing 14 <br /> 2.3.1 Initial Pilot Testing Scope 17 <br /> 2.3.2 Pilot Testing Source Water 18 <br /> 2.3.3 Pilot-Scale MRI Unit Testing 19 <br /> 2.3.4 Pilot-Scale Challenge Conditions Testing 22 <br /> 3. TREATABILITY TESTING RESULTS 24 <br /> 3.1 Bench-scale Tests 24 <br /> 3.1.1 Coagulation/Flocculation/Settling 24 <br /> 3.1.2 Manganese Removal 24 <br /> 3.1.3 Adsorptive Media 25 <br /> 3.2 Pilot-Scale Tests 26 <br /> 3.2.1 Pilot System Field Parameter Results 27 <br /> 3.2.2 Pilot System Anions,TSS, and DOC Results 28 <br /> 3.2.3 Pilot System Total and Dissolved Metals Results 29 <br /> 3.2.4 Formation of Biopolymer in Pilot System 29 <br /> 3.2.5 Challenge Conditions Testing 30 <br /> 3.2.6 MRI Unit Pilot System Testing Results 32 <br /> •1 reatabilitc 1 estinr Report v II December 11,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.