Laserfiche WebLink
List of Figures <br /> Figure 1 Project Location and Area Features <br /> Figure 2 Project Location and Area Features <br /> Figure 3 Project Groundwater Monitoring Wells and Piezometer Locations <br /> Figure 4 Elevation of the Top of the Pierre Shale <br /> Figure 5 Alluvium Thickness <br /> Figure 6 General Alluvial Groundwater Flow Directions (July 2019) <br /> Figure 7 Regional Water Quality (SO4 and NO3 Concentrations) from Flynn <br /> (2003) <br /> Figure 8 MW-01 - MW-04 Depth to Groundwater from Ground Surface <br /> Figure 9 MW-05— MW-09 Depth to Groundwater from Ground Surface <br /> Figure 10 MW-10— MW-14 Depth to Groundwater from Ground Surface <br /> Figure 11 Time-Trends, Iron, Nitrate as N, Sulfate and TDS <br /> Figure 12 Time-Series Trends, Uranium and Selenium <br /> Figure 13 Uranium, Calcium, Sulfate, Alkalinity Bi-Plots <br /> Figure 14 pH-Eh Stability Diagram <br /> List of Appendices <br /> Appendix A Well Completion Logs <br /> Appendix B Groundwater Sampling and Analysis Plan <br /> Appendix C Laboratory Results <br /> Appendix D Selenium Reduction Figures <br /> Appendix E Uranium Reduction Figures <br /> Appendix F Geochemical Modeling Outputs <br /> Appendix G Mixing Model Calculations <br /> Loveland Ready-Mix Concrete iii December 2019 <br /> TELE S T <br />