My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-13_HYDROLOGY - M2017036
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2017036
>
2020-04-13_HYDROLOGY - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 5:56:24 PM
Creation date
4/15/2020 5:53:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
HYDROLOGY
Doc Date
4/13/2020
Doc Name Note
Baseline Water Quality Evaluation December 2019
Doc Name
Hydrology Report
From
Loveland Ready-Mix Concrete
To
DRMS
Email Name
BFB
JLE
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
566
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> 1.0 INTRODUCTION 1 <br /> 1.1 Site History and Background 1 <br /> 1.2 Environmental Setting 2 <br /> 1.2.1 Geology 2 <br /> 1.2.2 Groundwater 2 <br /> 1.2.3 Groundwater Quality 3 <br /> 1.3 Objectives 4 <br /> 1.4 Approach 4 <br /> 1.4.1 Data Collection 4 <br /> 1.4.2 Identification of Site COCs 5 <br /> 1.4.3 Quantitative Assessment 5 <br /> 2.0 SITE DATA SUMMARY 6 <br /> 2.1 Depths to Groundwater 6 <br /> 2.2 Groundwater Quality 6 <br /> 2.2.1 Compliance Samples 6 <br /> 2.2.2 Solids Samples 7 <br /> 2.2.3 Leachate Samples 7 <br /> 2.2.4 Geochemical Evaluation Sampling 8 <br /> 3.0 EVALUATION AND DISCUSSION 9 <br /> 3.1 Water Quality Results 9 <br /> 3.2 Sources of Uranium 12 <br /> 3.3 Dewatering/Mixing 15 <br /> 4.0 CONCLUSIONS AND RECOMMENDATIONS 16 <br /> 5.0 REFERENCES 17 <br /> List of Tables <br /> Table 1 Regional Shallow Groundwater Quality Summary (Table 3 from <br /> Flynn, 2003) <br /> Table 2 Groundwater Quality Results, Compliance Wells - Dissolved - <br /> Through October 2019 <br /> Table 3 Groundwater Quality Results, Compliance Wells - Total - Through <br /> October 2019 <br /> Table 4 Pierre Shale Whole Rock Analysis <br /> Table 5 SPLP Results <br /> Table 6 Dissolved Iron, Selenium and Uranium in Non-Compliance Wells and <br /> Piezometers <br /> Table 7 Field Measured Ferric and Total Iron <br /> Table 8 Select Sample Geochemical Modeled Mineralogy Results <br /> Loveland Ready-Mix Concrete ii December 2019 <br /> „ T E L E S T O <br />
The URL can be used to link to this page
Your browser does not support the video tag.