Laserfiche WebLink
Tom Bird C1981035 TR29 <br /> Page 3 of 4 <br /> April 8,2020 <br /> 11)Maps: There are two labels for C21 on Map King II-007A. One points to a culvert under the <br /> Basin Ramp, and the other points to a ditch west of the large topsoil pile. Please explain and <br /> revise the submittal, as necessary. Note that the Culvert Capacities table lists the length of <br /> C21 as 40 feet. Also, do the font colors (red for one C21 label and black for the other) have <br /> significance? <br /> The following comments pertain to Section 4.03.2 —Access Roads <br /> 4.03.2(1) —General Requirements <br /> All information required by this section of the Rule has been provided. Please refer to Sections <br /> 2.05.3 of King's PAP and proposed page Section 2.04.6, page 8. While all general requirements <br /> have been met, it was observed that Section 2.05.3 of King's PAP needs to be updated to include <br /> discussions regarding the new access road. <br /> 12) Please update Section 2.05.3 to include discussion of the new access road to King III portals. <br /> 4.03.2(3) —Design and Construction <br /> 4.03.2(3)(e)(viii)—Per this Rule, "Embankment slopes shall not be steeper than 1.5h:1v, except <br /> that if the embankment material is minimum of 85 percent rock, slopes shall not be steeper than <br /> 1.35H:1v if it has been demonstrated to the Division that embankment stability will result." As <br /> shown on proposed Map King II-007M, upper portions of the access road embankment exceeds <br /> the maximum allowable slope of 1.5h:1v and 1.35h:1v (85%rock)with a slope 1.33H:1V. <br /> 13) As required by this Rule 4.03.2(3)(e)(viii),please provide a demonstration to the Division <br /> that embankment stability will result. <br /> 4.03.2(7) —Reclamation <br /> When reviewing King's proposed Section 2.04.6, page 8 as well as others, it states that <br /> "[r]eclamation for these areas is discussed elsewhere in this document." However, the Division <br /> was unable to find any information in regards to the reclamation of not only the proposed access <br /> roads, but currently approved roads as well in the approved King PAP and proposed pages. <br /> 14) Please update Section 2.05.4 —Reclamation Plan to include discussion regarding the <br /> reclamation of roads at the King Coal Mine. <br />