My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-08_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2020-04-08_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 1:04:56 PM
Creation date
4/8/2020 12:49:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/8/2020
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
GCC Energy, LLC
Type & Sequence
TR29
Email Name
JHB
THM
ZTT
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tom Bird C1981035 TR29 <br /> Page 2 of 4 <br /> April 8,2020 <br /> The following questions pertain to Appendix 11(2) <br /> 7) In the Drainage Basin ID Table, please explain why the facility areas are described as forest. <br /> Are curve numbers of 80 appropriate? <br /> 8) Related to the Ditch Capacities table,please address the following questions and comments. <br /> a) ID-7 has a bottom width but a triangular shape. <br /> b) It is unclear if ID-7 flows to ID-8 (per Structure Networking), Basin E1 (per"Station" <br /> column in Ditch Capacities table), or Culvert C21 (per Map King II-007A)? Please check <br /> and edit as necessary. <br /> c) ID-8 has a bottom width but a triangular shape. <br /> d) Where is ID-9 on Map King II-007A? Please revise text and/or map, as necessary. <br /> e) For ID-9, the depth in the SEDCAD printout(0.28') does not match the required depth in <br /> the Ditch Capacities table (0.82'). One of these appears to be a typo. <br /> 9) Related to the SEDCAD run that includes Pond 1, DRMS identified some apparent errors. <br /> When comparing the Structure Networking table and Map King II-007A, it is unclear how <br /> some model elements fit together. For example, is Structure 950 culvert C21, or is it ditch <br /> ID-5A? It also appears there are mistakes with the portion of the model that is not near the <br /> proposed portals. For example, Structure 944 may be culvert 17A or it may be ID-0. Please <br /> check the elements of the model and how they link together, and edit as necessary. <br /> 10)Related to the SEDCAD utility runs, please explain why channels L', M', and N' are not <br /> included in the SEDCAD run with the other CWD-2 channels. Also, there appear to be <br /> discrepancies (possibly typos) in the utility runs when compared to the Ditch Capacities of <br /> the current PAP. Please explain the following, and revise as necessary. <br /> a) For segment L' of CWD-2, the bottom width and slope have changed significantly. <br /> b) For segment M' of CWD-2, the slope has changed significantly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.