SUNDAY MINE COMPLEX-HYDROGEOLOGIC REPORT <br /> probing. The Top Rim Sandstone appeared to be dry or nearly dry in the area. The total depth <br /> of the hole was 600 ft from surface. <br /> The screened interval (2-inch schedule 80 PVC) was completed within the Top Rim Sandstone <br /> in accordance with the geophysical log and direction by EFR; the interval was from 490 to 570 <br /> ft. A lockable steel surface casing was cemented in place for the surface completion. Appendix <br /> E shows details of the well completion and Table 9-1 presents a summary of well construction <br /> information. <br /> The well was developed by air lifting with the drill rig and followed by additional pumping with a <br /> nitrogen piston pump. The total estimated volume purged was 122.7 gallons. Due to high <br /> turbidity conditions, additional well development was conducted by pumping in June 2013. <br /> Groundwater recovery rates at the MW-SUN3 well are slow. <br /> 9.1.4 MW-TPZ1 <br /> Well MW-TPZ1 is permitted by the DWR under permit number 287946. Drilling of the well <br /> borehole commenced on May 7, 2013, and was completed on May 8, 2013, by D.A. Smith <br /> Drilling Company. The well location is in SE 1/4, SE IA, Section 10, Township 44 North, Range 18 <br /> West, New Mexico Principal Meridian. The well was installed just downslope of the main <br /> development rock area (waste rock dump) of the Topaz Mine. The well borehole was drilled to a <br /> depth of 29 ft to confirm penetration of bedrock which was suspected to have been penetrated <br /> at approximately 18 ft. The hole was backfilled with cuttings to 20 ft and the well was installed. <br /> No groundwater was encountered. Two-inch schedule 40 PVC screen was set from 10 to 20 ft <br /> and the remainder of the well completed with blank casing as shown in the well diagram <br /> (Appendix E). A lockable steel surface casing was cemented in place for the surface <br /> completion. Appendix E presents the well permit, construction form, and well diagram <br /> documents for the MW-TPZ1 well. Table 9-1 presents a summary of well construction <br /> information. <br /> 10.0 GROUNDWATER MONITORING <br /> Groundwater monitoring activities for the SMC project include groundwater elevation <br /> measurements and water quality sampling. Surface water quality monitoring was not included in <br /> the water quality monitoring plan as there are no perennial or intermittent water bodies in the <br /> area affected by the SMC (Denison 2012). <br /> Western Water& Land, Inc. 30 <br />