Laserfiche WebLink
• Engaged Dave Hallman,P.G.,P.E.,of Applied Geologic to engineer the Idaho Tunnel <br /> rehabilitation and related water management for the corrective action Technical Revision. <br /> • Obtained ground-true LIDAR mapping to facilitate future water management and permitting <br /> efforts. <br /> Calais appreciates the opportunity to work with the Division in bringing this Project into compliance. <br /> Please feel free to reach out with any questions or concerns. <br /> Sincerely, <br /> jzi <br /> L.......4 //Pr wow, <br /> Richard D. Mittasch <br /> Vice President <br /> Calais Resources Colorado,Inc. <br /> PO BOX 3395 <br /> Nederland,CO 80466 <br /> (0):720-893-3749 <br /> (NI):516-582-0833 <br /> admin@nedmining.com <br /> ATTACHMENTS: <br /> Energy Laboratories Results-B20020969 <br /> Energy Laboratories Results-B20021855 <br /> CC:Jacob Dyste,CDPHE,WQCD <br /> 2 MIMI <br />