My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-16_INSPECTION - M1974069
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1974069
>
2020-03-16_INSPECTION - M1974069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2020 2:53:17 PM
Creation date
3/18/2020 12:16:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974069
IBM Index Class Name
INSPECTION
Doc Date
3/16/2020
Doc Name
Corrective Action Documentation
From
Loveland Ready-Mix Concrete
To
DRMS
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#022 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> -, <br /> Task description: Retopsoil 1 res Cell 20 <br /> Site: Larimer Pit - Permit Action: 1/16/2020 Inspection Permit/Job#: M1974069 <br /> PROJECTA�1►YY►h ICATION <br /> Task •: 022 State: Colorado _ Abbreviation: None <br /> Date 2/19 120 County: Larimer Filename: M069-022 <br /> User: •ME <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance-Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker,3,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA 100 100 100 <br /> Ownership cost/hour: $162.02 NA NA $103.86 $82.71 $13.51 <br /> Operating cost/hour: $184.64 NA NA $82.26 $70.09 $28.95 <br /> %Utilization-ripper: NA NA NA NA 100 NA <br /> Ripper own.cost/hour: NA NA NA $0.00 $4.44 $0.00 <br /> Ripper op.cost/hour: NA NA NA $0.00 $3.92 $0.00 <br /> Operator cost/hour: $45.58 NA NA $39.98 $45.39 $0.00 <br /> Unit Subtotals: $392.24 NA NA $226.10 $206.54 $42.46 <br /> Number of Units: 2 0 0. 1 . 1 1 <br /> Group Subtotals: Work: $784.48 Support: $226.10 Maint: $249.00 <br /> Total work team cost/hour: $1,259.58 <br /> MATERIAL QUANTITIES 0 <br /> Initial volume: 8,873 a�I CCY Swell factor: 1.215 <br /> Loose volume: 11 LCY'kb <br /> Source of estimated volume: j,14c x 6 in depth <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.