Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#015 Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br /> 1 1800.00 1.00 3.00 4.00 1774 1.204 <br /> Haul Time: 1.204 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res 'I Total Res Velocity Travel <br /> (Ft) (%) ' (%) (fpm) Time <br /> (min) <br /> 1 1800.00 -1.00 3.00 1 2.00 3040 0.739 <br /> Return Time: 0.739 minutes <br /> Total Truck Cycle Time: 4.963 minutes <br /> Loading Tool unit <br /> Production 653.47 LCY/Hour Adjusted for job efficiency: 542.38 LCY/Hour <br /> Truck Unit Production <br /> 265.97 LCY/Hour Adjusted for job efficiency: 220.75 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 1 Truck(s) <br /> Adjusted hourly truck team production: 220.75 LCY/Hour <br /> Adjusted single truck/loader team production: 220.75 LCY/Hour <br /> Adjusted multiple truck/loader team production: 220.75 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 8)2 Hours <br /> Unit cost: $3.195 /LCY Total job cost: $572 141 12 <br /> CIRCES Cost Estimating Software <br />